New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
YAMHILL COUNTY <br />Name: OR153: SALT CREEK (ASH SWALE) BRIDGE #05041 <br />Key: 14809 <br />Hwy/St: BELLEVUE-HOPEWELL <br />OR 153 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />5.78 to 5.98 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$298,000 2009 STP $267,395 <br />$695,000 2010 STP $623,624 <br />$0 <br />$13,460,000 2011 STP $12,077,658 <br />$0 <br />Description: Total: $14,453,000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />REPLACE BRIDGE #05041 Work type: Bridee <br />Name: OR18 @ GOPHER VALLEY ROAD <br />Key: 14918 <br />Hwy/St: SALMON RIVER <br />• OR 18 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />34.70 to 35.00 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$51,000 2008 HSIP $47,032 <br />$0 <br />$0 <br />$458,000 2009 HSIP $304,105 HSIP $118,263 <br />$0 <br />Description: Total: 509 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />RIGHT TURN DECEL LANE AND OTHER SAFETY IMPROVEMENTS Work type: Safe <br />Name: OR99W @ 5TH ST SIGNAL (DUNDEE) <br />Key: 12670 <br />Hwy/St: PACIFIC WEST <br />• OR 99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />25.83 to 37.66 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br /> <br />$310,000 2005 <br />$225,000 2007 <br />$80,000 2007 <br />$812,000 2009 STP $502,739 BIKPED $97,440 STP $131,149 <br />$0 <br />Description: Total: $1,427,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />REPLACE SIGNAL AT 99W/5TH ST IN DUNDEE Work type: Operations <br />Footnote: Project has Safety & Bikped elements <br />Name: OR99W: SUNSET (SHERWOOD)-BRUTSCHER ST (NEWBERG) Key: 14791 <br />Hwy/St: PACIFIC WEST <br />OR 99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: - <br />Planning: <br />Milepoints: <br />16.67 to 21.82 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $6.610,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />OVERLAY Work type: Pavement Preservation <br />Name: OR99W @ WHITESON/RIVERBEND ROADS <br />Key: 14769 <br />Hwy/St: PACIFIC WEST <br />• OR 99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />41.96 to 41.97 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$29,000 2008 HSIP $26,744 <br />$130,000 2009 HSIP $119,886 <br />$0 <br />$532,000 2011 HSIP $490,610 <br />$0 <br />Description: Total: $691,000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />LEFT-TURN REFUGE Work type: Safe <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 174 <br />i <br />} <br />.1 <br />°) <br />_, \ <br />1} <br />
The URL can be used to link to this page
Your browser does not support the video tag.