POLK COUNTY <br />Name: OR22: OR 18-OR99 W <br />Hwy/St: WILLAMINA-SALEM Key: 14789 <br />R 22 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: O - <br />Planning: <br />Milepoints: <br />0.30 to 11.70 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $4,997.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />OVERLAY Work type: Pavement Preservation <br />Name: OR22W @ PERRYDALE RD <br />Key: 13778 <br />Hwy/St: WILLAMINA-SALEM <br />• OR 22 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />11.70 to 12.60 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$308,000 2006 <br />$65,000 2008 HSIP $59,943 <br />$0 <br />$2,527,000 2009 HSIP $2,330,399 <br />$0 <br />Description: Total: $2.900.000 Applicant: ODOT <br />REALIGN COUNTY ROADS' INTERSECTION WITH HIGHWAY <br />Status: Const. scheduled to begin in 2009 <br />Work type: Safe <br />Name: OR99W @ BETHEL ROAD <br />Key: 14756 <br />Hwy/St: PACIFIC WEST <br />OR 99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: - <br />Planning: <br />Milepoints: <br />49.39 to 49.40 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$164,000 2008 HSIP $151,241 <br />$25,000 2008 HSIP $23,055 <br />$0 <br />$1,586,000 2010 HSIP $1,462,609 <br />$0 <br />Description: Total: $1.775.000 Applicant: ODOT <br />RAISE ROADWAY GRADE, CUT BACK EMBANKMENT, ADD DELINEATION & <br />LEFT-TURN REFUGE ON 99W <br />Status: Const. scheduled to begin inlU 10 <br />Work type: Safe <br />Name: OR221 (WALLACE RD) @ GLEN CR ROAD (SALEM) <br />Hwy/St: SALEM-DAYTON Key: 1487 <br />OR 221 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: - <br />Planning: <br />Milepoints: <br />20.31 to 20.48 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />SALEM-ICEIZER MPO Other: <br />$0 <br />$500,000 2008 STP $448,650 <br />$4,287,000 2010 OTHER $4,287,000 <br />$0 <br />$3,914,000 2011 STP $1,966,738 STP-U $1,545,294 <br />$0 <br />Description: Total: 8 701 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />RECONSTRUCT INTERSECTION; ADD SECOND LEFT-TURN LANE Work type: Modernization <br />(NORTHBOUND TO WESTBOUND) Footnote: MATCH PAID BY LOCALS <br />Name: OR221: DAYTON-SALEM <br />Key: 13675 <br />Hwy/St: SALEM-DAYTON <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-221 <br /> Planning: <br />Milepoints: <br />0.00 to 17.00 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $4.821.000 Applicant: ODOT Status: Advanced from FY 2008 <br />OVERLAY Work type: Pavement Preservation <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 169 <br />