New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LINN COUNTY <br />Name: US20 @ BIG LAKE ROAD <br />Hwy/St: SANTIAM Key: 14767 <br />US 20 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: - <br />Planning: <br />Milepoints: <br />79.83 to 80.05 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$15,000 2008 HSIP $13,833 <br />$7,000 2008 HSIP $6,455 <br />$0 <br />$253,000 2010 HSIP $233,317 <br />$0 <br />Description: Total: 275 000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />ADD ACCELERATION LANE TAPER & CONSTRUCT DECELERATION LANE Work type: Safe <br />Name: US20 @ AIRPORT ROAD (LEBANON) <br />Key: 13663 <br />Hwy/St: SANTIAM <br />• US 20 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />14.07 to 14.17 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$136,000 2006 <br />$254,000 2008 EARMK $22,791 EARMK $182,331 <br />$0 <br />$543,000 2009 EARMK $97,447 EARMK $389,787 <br />$0 <br />Description: Total: 933 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />ADD RIGHT-TURN LANE ON AIRPORT RD AND ADNST SIGNAL Work type: Safe <br />Name: US20: MP 34.2 CURVE IMPROVEMENT <br />Key: 14754 <br />Hwy/St: SANTIAM <br />US 20 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: - <br />Planning: <br />Milepoints: <br />34.00 to 34.04 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$325,000 2008 HSIP $299,715 <br />$25,000 2008 HSIP $23,055 <br />$1,000 2009 HSIP $922 <br />$2,149,000 2011 HSIP $1,981,808 <br />$0 <br />Description: Total: 2 500 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />IMPROVE CURVE Work type: Safe <br />Name: ALBANY MULTIMODAL TRANSIT STATION PATH <br />Hwy/St: ALBANY-JiJNCTION CITY Key: 14536 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />2.00 to 2,Op Design: <br />ACT/AREA: Land Purchase: <br />CWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$60,000 2006 <br />$10,000 2008 EARMK $8,973 <br />$0 <br />$570,000 2009 EARMK $102,292 EARMK $409,169 <br />$0 <br />Description: Total: 640 000 Applicant: CITY OF ALBANY Status: Const. scheduled to begin in 2009 <br />CONSTRUCT PATH Work type: Bicvcle/Pedestrian <br />Name: THOMAS CRK, CAMP MORRISON RD (HANNAH) COVERED BR <br />Key: 15649 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.06 to 0.08 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 788 000 Applicant: LINN COUNTY Status: Const. scheduled to begin in 2009 <br />STRUCTURAL REPAIR; RESTORE EXTERIOR; ROOF & DECK; EROSION Work type: Bridge <br />CONTROL; BR RAIL BR#12943 <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.