New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LINN COUNTY <br />Name: I-5 @ OR 228 INTERCHANGE <br />Key: 15200 <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />216.34 to 217 .04 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 310 000 Applicant: ODOT Status: Advanced from FY 2008 <br />REPAIR PAVEMENT DAMAGE TO IMPROVE INTERCHANGEOPERATIONS DUE Work type: Operations <br />TO HEAVY TRUCK TRAFFIC <br />Name: OR22: PAMELIA RD-TWIN MEADOWS <br />Key: 14747 <br />Hwy/St: NORTH SANTIAM <br />• OR 22 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />62.30 to 70,20 Design: <br />ACT/AREA: Land Purchase: <br />CWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $2,488,000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />OVERLAY Work type: Pavement Preservation <br />Name: OR34: ROCHE STREET-WOLCOTT ROAD <br />Key: 12580 <br />Hwy/St: CORVALLIS-LEBANON <br />• OR 34 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />0.42 to 1.21 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$464,000 2004 <br />$1,244,000 2008 NHS $1,116,241 <br />$52,000 2008 NHS $46,660 <br />$4,625,000 2011 EARMK $415,001 EARMK $1,784,505 HSIP $1,919,329 BIKPED $92,500 '' <br />$0 <br />Description: Total: $6.385.000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />CONSTRUCT FRONTAGE ROADS & MULTI-USE PATH; IMPLEMENT ACCESS Work type: Safe <br />CONTROL Footnote: Project has Bikped element <br />Name: OR99E: HALSEY-HARRISBURG BRIDGE REPLACEMENTS Key: 14977 <br />Hwy/St: ALBANY-NNCTION CITY <br />• OR 99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />20.57 to 2g,20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$316,000 2005 <br />$35,000 2008 STP $23,240 HBRR $8,165 <br />$0 <br />$8,465,000 2008 EARMK $3,949,735 STP $2,658,476 HBRR $987,434 <br />$0 <br />Description: Total: 8 816 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPLACE BRIDGES 00569,00568,00570,00608/PAVEMENT PRESERVATION Work type: Brid e <br />BETWEEN HALSEY & HARRISBURG Footnote: Project has Preservation element <br />Name: OR99E: CALAPOOIA STREET TO CORVALLIS-LEBANON HWY Key: 14834 <br />Hwy/St: ALBANY-JUNCTION CITY <br />• OR 99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />2.90 to 8.09 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />OVERLAY <br />$0 <br />$110,000 2008 STP $98,703 <br />$0 <br />$26,000 2008 STP $23,330 <br />$2,094,000 2010 STP $1,878,946 <br />$0 <br />$2,230,000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2010 <br />Work type: Pavement Preservation <br />2008-2OL1 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.