LINCOLN COUNTY <br />Name: US101: BIG CREEK BRIDGE #01430A <br />Key: 14801 <br />Hwy/5t: OREGON COAST <br />• US 101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />160.05 to 160.25 Design: <br />ACT/AREA: L and Purchase: <br />CWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$399,000 2008 HBRR $358,023 <br />$0 <br />$1,000 2010 HBRR $897 <br />$785,000 2011 HBRR $704,381 <br />$0 <br />Description: Total: $1.185.000 Applicant: ODOT <br />CATHODIC PROTECTION; REPAIR CRACKS; STRENGTHEN CROSSBEAMS <br />Status: C;onst. scheduled to begin m 111 l l <br />Work type: Bridee <br />Name: US 101: YAQUINA BAY BRIDGE #01820 REPAIR <br />Key: 14804 <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />141.33 to 142.07 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$542,867 <br />$8,550,372 <br />Description: Total: $10.134.000 Applicant: ODOT <br />REPAIR STEEL ON BRIDGE (STRINGER FLANGE, SPANDRELS, STRINGER ENDS, <br />WELD REPAIRS, ETC.) <br />Status: Const. scheduled to begin in 2011 <br />Work type: Bridee <br />Name: US101: SE 16TH - SE 36TH STREET (LINCOLN CITY) Key: 14862 <br />Hwy/St: OREGON COAST <br />• US 101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />116.72 to 116 .74 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />CWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$500,000 2007 <br />$250,000 2008 NHS $224,325 <br />$0 <br />$9,574,000 2010 NHS $7,903,490 BIKPED $382,960 STATE $382,960 <br />$0 <br />Description: Total: $10.324.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />REALIGNMENT, ACCESS IMPROVEMENTS, ADDITIONAL CAPACITY AND Work type: Modernization <br />SAFETY IMPROVEMENTS <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 140 <br />.~ <br />~) <br />,. ,~ <br />~._~ <br />t` <br />.~ <br />C.~ <br />