LANE COUNTY <br />Name: GATEWAY BLVD IMPROVEMENTS (COTTAGE GROVE) Key: 14072 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$10,000 2008 EARMK $8,973 <br />$0 <br />$0 <br />$100,000 2008 EARMK $17,946 EARMK $71,784 <br />$0 <br />Description: Total: 110 000 Applicant: COTTAGE GROVE <br />CONSTRUCT TURN LANE ON GATEWAY BLVD. IN COTTAGE GROVE. LOCAL <br />FEDERAL EARMARK. <br />status: const. scneauiea ro negm m wva <br />Work type: Modernization <br />Name: GATEWAY/BELTLINE: INTERNATL WAY-POSTAL WAY (SPFLD) Key: 14305 <br />Hwy/St: INTERNATIONAL WAY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />Description: Total: $2,500,000 Applicant: CITY OF SPRINGFIELD Status: Non-Construction Project 2008 <br />IMPROVE INTERSECTIONS AND REALIGN GATEWAY ST Work type: Modernization <br />Name: CHAD DRIVE EXTENSION Key: 13404 <br />Hwy/St: CHAD DRIVE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$257,000 2006 <br />$150,000 2008 OTHER $150,000 <br />$0 <br />$1,600,000 2008 STP-U $689,126 OTHER $832,000 <br />$0 <br />Description: Total: $2,007.000 Applicant: CITY OF EUGENE Status: Const. scheduled to begin in 2008 <br />EXTEND CHAD DRIVE TO OLD COBURG ROAD AND REWORK INTERSECTION Work type: Modernization <br />AT N GAME FARM ROAD <br />Name: BERTLESEN ROAD: 18TH ST-BAILEY HILL RD (EUGENE) Key: 15539 <br />Hwy/St: BERTLESON RD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints. <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />Description: Total: $2.369.000 Applicant: CITY OF EUGENE Status: Const. scheduled to begin in 2011 <br />UPGRADE TO MINOR ARTERIAL STNDS WITH TWO TRAVEL LANES, TURN Work type: Modernization <br />LANE, BIKE LANES & SIDEWALKS <br />Name: ELMIRA RD/MAPLE ST: BERTELSEN-ROOSEVELT (EUGENE) Key: 15540 <br />Hwy/St: ELMIRA RD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />Description: Total: $4,870,000 Applicant: CITY OF EUGENE Status: Const. scheduled to begin in 2009 <br />UPGRADE TO NEIGHBORHOOD COLLECTOR W/ SHARED BIKE & TRANSIT Work type: Modernization <br />FACILITES <br />200$_2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 127 <br />