New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANE COUNTY <br />Name: I-5 @ BELTLINE INTCH UNIT 2 (EUGENE/SPRINGFIELD) <br />Hwy/St: PACIFIC Key: 14314 <br />R I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. - <br />Planning: <br />Milepoints: <br />194.50 to 196 .50 Design: <br />ACT/AREA: Land Purchase: <br />LANECO Utility Reloc: <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$3,000,000 2007 <br />$5,000,000 2007 <br />$0 <br />$14,500,000 2009 OTIAIII $7,830,000 OTIAIII $2,030,000 NHS $3,122,604 NHS $1,040,868 <br />$0 <br />Description: Total: $22,500,000 Applicant: ODOT <br />INTERCHANGE MODERNIZATION -PHASE 2 <br />Status: Const. scheduled to begin in 2009 <br />Work type: Modernization <br />Name: I-5 @ COBURG INTERCHANGE <br />Key: 14649 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-5 <br />Planning: $0 <br />Milepoints: <br />0.00 to 0.00 Design: $3,000,000 2006 <br />ACT/AREA: Land Purchase: $0 <br />LANECO Utility Reloc: $0 <br />Construction: $16,107,000 2009 NHS $5,492,068 EARMK $8,960,743 <br />MPO: <br />CENTRAL LANE MP Other: $0 <br />Description: Total: $19,107,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />INTERCHANGE MODERNIZATION IMPROVEMENT Woik type: Modernization <br />Footnote: SAFETEA-LU EARMARK MATCH FR LANE CO <br />Name: I-5: LANE COUNTY INTERSTATE SIGN REPLACEMENT <br />Hwy/St: PACIFIC Key: 15574 <br />R 15 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. - <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />Description: Total: <br />SIGN REPLACEM ENT <br />$0 <br />$280,000 2008 STATE $140,000 IM $129,108 <br />$0 <br />$0 <br />$4,000,000 2008 IM $3,688,800 <br />$~ - - -_ <br />$4.280.000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2008 <br />Work type: Pavement Preservation <br />Name: I-5: WILLAMETTE RIVER-MARTIN CREEK <br />Hwy/St: PACIFIC Key: 14848 <br />• I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />169.20 to 192 .52 Design: <br />ACT/AREA: Land Purchase: <br />LANECO Utility Reloc: <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />Description: Total: <br />PAVEMENT PRESERVATION <br />$0 <br />$691,000 2008 IM $637,240 <br />$0 <br />$0 <br />$14,622,000 2010 IM $13,484,408 <br />$0 <br />$15,313,000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2010 <br />Work type: Pavement Preservation <br />Name: I-5 @ COBURG INTERCHANGE AREA PLANNING (COBURG) <br />Key: 15276 <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />198.70 to 199 .70 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />Description: Total: $17,000 Applicant: CITY OF COBURG Status: Planning 2008 <br />PLANNING SUPPORT FOR CITY PARTICIPATION IN LAMP PROCESS Work type: Plannine <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.