New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLATSOP COUNTY <br />Name: US 101: COLUMBIA R (ASTORIA-MEGLER) BR#07949A PAINT Key: 14835 <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />0.00 to 0.70 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$4,982,707 <br />Description: Total: $5,598,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />PAINT NORTH SPAN OF BRIDGE,JOINT PROJ W/WSDOTODOT IS LEAD. COST Woik type: Bridee <br />SHOWN IS ODOT SHARE. <br />Name: US101: NECANICUM RIVER (SKIBERENE) BR #01481 <br />Key: 14802 <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br />Planning: <br />Milepoints: <br />24.00 to 24.20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$263,000 2009 HBRR $235,990 <br />$6,000 2010 HBRR $5,384 <br />$1,000 2010 HBRR $897 <br />$2,652,000 2011 HBRR $2,379,640 <br />$0 <br />Description: Total: 2 922 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />WIDEN BRIDGE; REPAIR CRACKS IN GIRDERS, CAPS & COLUMNS; SCOUR Woik type: Bridee <br />PROTECTION <br />Name: US101: COLUMBIA RIVER (ASTORIA-MEGLER) BR #07949C Key: 14183 <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br /> Planning: <br />Iviilepoints: <br />1.80 to 3.03 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $17.759.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />PAINT BRIDGE-JOINT PROJ WITH WSDOT/ODOT IS LEAD/WSDOT TO PAY Work type: Bridse <br />50%/COST SHOWN IS ODOT SHARE <br />Name: US101: CAMP RILEA-SURF PINES RD UNIT 1 (GLENWOOD) Key: 14864 <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />12.50 to 13.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $500.000 Applicant: ODOT Status: Env Doc sched. to begin in 2010 <br />DEVELOPMENT WORK TOWARD WIDENING IN GLENWOOD VILLAGE AREA Work type: Modernization <br />Name: US101 AT BROADWAY ST & AVENUE U (SEASIDE) <br />Key: 14771 <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br />Planning: <br />Milepoints: <br />21.04 to 22,18 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$200,000 2008 HSIP $184,440 <br />$190,000 2008 HSIP $175,218 <br />$60,000 2008 HSIP $55,332 <br />$1,212,000 2010 HSIP $659,447 STP $445,886 <br />$0 <br />Description: Total: $1,662.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />TRAFFIC SIGNALS REBUILD/REPLACE & INTERSECTION IMPROVEMENTS Work type: Safe <br />Footnote' Project has Operations element <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.