CLATSOP COUNTY <br />Name: OR53: NECANICUM RIVER BRIDGE <br />Key: 13998 <br />Hwy/St: NECANICUM <br />R OR 53 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. - <br />Planning: <br />Milepoints: <br />0.11 to 0,12 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$173,000 2006 <br />$22,000 2009 HBRR $19,741 <br />$0 <br />$1,536,000 2008 HBRR $1,102,602 STP $275,651 <br />$0 <br />Description: Total: 1 731 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPLACE BRIDGE (#03084) Work type: Brides <br />Name: REGION 2 FISH PASSAGE (BERGSVIK CREEK) <br />Key: 13 809 <br />Hwy/St: NECANICUM <br />R te• OR-53 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />2.24 to 2.34 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$164,000 2008 STP $147,157 <br />$6,000 2007 <br />$0 <br />$683,000 2009 STP $612,856 <br />$0 <br />Description: Total: 853 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />REPLACE CULVERT Work type: Salmon Restoration <br />Name: U526:VOLMER CR BR & JOHNSON CR BR <br />Key: 15183 <br />Hwy/St: SUNSET <br />R US-26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. <br />Planning: <br />Milepoints: <br />2 24 to 3 27 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$200,000 2007 <br />$42,000 2008 STP $37,687 <br />$100,000 2008 STP $89,730 <br />$1,892,000 2009 STP $1,697,692 <br />$0 <br />Description: Total: $2.234,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />REPLACEMENTS OF BR # 03091A & 03092A Work type: Brides <br />Name: US26: NECANICUM RIVER (BLACK) BRIDGE #02601 <br />Hwy/St: SUNSET Key: 14806 <br />R US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. - <br />Planning: <br />Milepoints: <br />4.30 to 4.50 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br /> <br />$63,000 2009 HBRR $56,530 <br />$6,000 2010 HBRR $5,384 <br />$1,000 2010 HBRR $897 <br />$686,000 2011 HBRR $615,548 <br />$0 <br />Description: Total: 756 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />RETROFIT RAILS; REPAIR SPACES IN DECK & COLUMNS; STRENGTHEN CAPS; Woik type: Brides <br />SEISMIC RETROFIT <br />Name: US30: JOHN DAY RIVER BRIDGE <br />Key: 11798 <br />Hwy/St: LOWER COLUMBIA RIVER <br />R US-30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. <br />Planning: <br />Milepoints: <br />92.40 to 92.61 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $2,614,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />BRIDGE END PANEL REPLACEMENTS (BR #01827B) Woik type: Brides <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 114 <br />