MARION COUNTY <br />Name: OR99E: PUDDING RIVER RELIEF CHANNEL BR #01830 Applicant: ODOT Key: 14805 <br />Hwy/St: PACIFIC HWY EAST <br />R te• OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />24.71 to 24.91 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $1,633,000 Status: Const. scheduled to begin in 2010 Work type: Bridee <br />REPAIR CRACKS IN CAPS & COLUMNS; SEISMIC RETROFIT; RETROFIT RAILS <br />Name: OR99E: NORTH CITY LIMITS -DST (HUBBARD) Applicant: CITY OF HUBBARD Key: 15472 <br />Hwy/St: PACIFIC HWY EAST <br />R te• OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou <br />Planning: <br />Milepoints: <br />28.90 to 29.30 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 991 000 Status: Const. scheduled to begin in 2010 Work type: Enhancement <br />SI DE WALK,LANDSCAPING,LIGHTING <br />Name: OR99E @ BELLE PASSI ROAD Applicant: ODOT Key: 14755 <br />Hwy/St: PACIFIC HWY EAST <br />R te• OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />33.90 to 34.20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />_--- <br />$0 <br />$100,000 2008 <br />$27,000 2008 <br />$0 <br />$1,049,000 2010 HSIP $967,388 <br />$0 <br />Description: Total: $1,176.000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />CONSTRUCT TWO WAY CENTER TURN LANE <br />Name: OR99BUSINESS: VERDA LANE-CHERRY AVE Applicant: ODOT Key: 13659 <br />Hwy/St: SALEM <br />Route: OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Milepoints: Planning: <br />1.45 to 2,70 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br />Construction: <br />MPO: <br />SALEM-KEIZER MPO Other: <br />$0 <br />$105,000 2007 <br />$1,000 2008 <br />$0 <br />$1,132,000 2010 HSIP $1,043,930 <br />$0 <br />Description: Total: 1 238 000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />INTERSECTION IMPROVEMENTS INCLUDING SIGNING & SIGNAL MODIFICATIONS <br />Name: OR99E: YOUNG STREET SAFETY & ADA RAMPS (WOODBURN) Applicant: ODOT Key: 16008 <br />Hwy/St: PACIFIC EAST <br />R te• OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />32.87 to 32.87 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$120,000 2008 <br />$20,000 2008 <br />$0 <br />$474,000 2011 HSIP $437,123 <br />$0 <br />Description: Total: 614 000 Status: Const. scheduled to begin in 2011 Work type: Safe <br />SAFETY IMPROVEMENTS AT OR99E/YOUNG ST, INCREASE TURNING RADIUS & RELOCATE SIGNAL POLES <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 89 <br />