New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARION COUNTY <br />Name: OR551 @ EHLEN RD Applicant: ODOT Key: 16121 <br />Hwy/St: WILSONVILLE-HUBBARD <br />R te• OR551 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />3.39 to 0,1 g Design: <br />ACT/AREA: Land Pnrchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$695,000 2010 HSIP $640,929 <br />$1,770,000 2011 HSIP $1,632,294 <br />$0 <br />$3,363,000 2012 HSIP $3,101,359 <br />$0 <br />Description: Total: $5.828.000 Status: Const. scheduled to begin in 2012 <br />BULD LEFT TURN LANES, REBUILD SIGNAL. INSTALL TRAFFIC SEPARATOR. <br />Work type: Safe <br />Name: OR22 @ GROVE ST & OR226 (MEHAMA) Applicant: ODOT Key: 14753 <br />Hwy/St: NORTH SANTIAM <br />R te• OR-226 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />22 37 to 22 38 Design: <br />AC.1./AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$368,880 <br />Description: Total: 454 000 Status: Const. scheduled to begin in 2010 <br />WIDENING HIGHWAY, ADDING GUARDRAIL & CONCRETE BARRIER <br />Work type: Safe <br />Name: OR22: CORDON ROAD SE O'XING (BRIDGE #08473) Applicant: ODOT Key: 14846 <br />Hwy/St: NORTH SANTIAM <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-22 ..... <br />Planning: $0 <br />Milepoints: <br />2 72 to 2 92 Design: $268,000 2007 <br />ACT/AREA: Land Purchase: $30,000 2008 <br />MWACT Utility Reloc: $0 <br />Construction: $3,790,000 2010 HBP $3,400,767 <br />MPO: <br />SALEM-KEIZER MPO Other: $0 <br />Description: Total: 4 088 000 Status: Const. scheduled to begin in 2010 Work type: Bridee <br />RAISE BRIDGE #08473 <br />Name: OR22: WILLAMETTE R (MARION ST) BR#07253B (SALEM) Applicant: ODOT Key: 15845 <br />Hwy/St: WILLAMINA-SALEM <br />Route: OR-22 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: _Share: <br />Planning: $0 <br />Milepoints: <br />25.90 to 26.00 Design: $500,000 2008 <br />Ate./ Land Purchase: $0 <br />MWACT Utility Reloc: $0 <br />Construction: $3,206,000 2010 BP-DISC $2,876,744 <br />MPO: <br />SALEM-KEIZER MPO Other: $0 <br />Description: Total: 3 706 000 Status: Const. scheduled to begin in 2010 Work type: Bridee <br />DECK OVERLAY, BRIDGE #07253B <br />Name: OR22: LANCASTER DR SE O'XING (SALEM) BR #07770 Applicant: ODOT Key: 15874 <br />Hwy/St: NORTH SANTIAM <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-22 <br />Planning: <br />Milepoints: <br />1.85 to 1.95 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br />Construction: <br />MPO: <br />SALEM-KEIZER MPO Other: <br />HBP ~ $2,846,236 <br />Description: Total: 3 892 000 Status: Const. scheduled to begin in 2010 <br />INCREASE VERTICAL CLEARANCE FOR BRIDGE 07770 <br />Work type: Bridee <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.