LANE COUNTY <br />Name: OR58: SALT CREEK TUNNEL & HALF VIADUCTS Applicant: ODOT Key: 16035 ' <br />Hwy/St: WILLAMETTE ~ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-58 <br />Planning: <br />Milepoints: <br />55.95 to 56.34 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$4,001,000 2010 HBP $3,590,097 <br />$113,000 2011 HBP $101,395 <br />$292,000 2011 HBP $262,012 <br />$24,541,000 2012 HBP $22,020,639 <br />$0 <br />ll~ <br />`. ~_ J <br />i <br />Description: Total: $28.947.000 Status: Const. scheduled to begin in 2012 Work type: Bridee <br />REPAIR CRACKEDTUNNEL LINER (02539); REPLACE BRIDGES (07185, 07186, 07187 & 07188) <br />Name: OR58: EAGLE CREEK-SALT CREEK TUNNEL Applicant: ODOT Key: 14752 <br />Hwy/St: WILLAMETTE :. ~ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: i <br />Route: OR-58 <br /> Planning: <br />Milepoints: <br />48.30 to 56.00 Design: <br />ACT/AREA: Land Purchase: <br />LANECO Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$179,000 2008 <br />$5,000 2010 NHS $4,487 <br />$0 <br />$3,768,000 2011 NHS $3,381,026 <br />$0 <br />_~ <br />_J <br />_. <br />- -.~ <br />Description: Total: 3 952 000 Status: Const. scheduled to begin in 2011 Work type: Pavement Preservation ^ - -1 <br />~:_~_/ <br />OVERLAY <br />~_ ~ <br />',_~ <br />Name: OR69: DELTA HWY O'XING BR #09358 Applicant: ODOT Key: 16034 <br />Hwy/St: BELTLINE <br />Route: OR-69 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ':~ <br />Milepoints: Planning: <br />10.03 to 10.06 Design: <br />ACT/AREA: Land Purchase: <br />LANECO Utility Reloc: <br />Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$361,000 2011 HBP $323,925 <br />$6,000 2012 HBP $5,384 <br />$0 <br />$1,662,000 2013 HBP $1,491,313 <br />$0 <br />~ , <br />I, ') <br />~. <br />Description: Total: $2,029.000 Status: Const. scheduled to begin in 2013 Work type: Bridee ,___~ <br />1 <br />DECK OVERLAY; REPAIR SPALLED RAIL PARAPETS; BRIDGE #09358 ~~.. <br />Name: OR99 @ 4TH AND 9TH SIGNALS (COTTAGE GROVE) Applicant: ODOT Key: 14781 i'_ <br />Hwy/St: GOSHEN-DIVIDE ` - <br />OR 99 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~ -. ,. <br />Route. - <br />Planning: <br />Milepoints: <br />14.75 to 15.36 Design: <br />ACT/AREA: Land Purchase: <br />LANECO Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$65,000 2009 <br />$55,000 2009 <br />$0 <br />$592,000 2011 STP $531,202 <br />$0 <br />~. ,- <br />1.. <br />~- <br />... <br />( i <br />Description: Total: 712 000 Status: Const. scheduled to begin in 2011 Work type: Operations (~ <br />MODIFY SIGNAL AT 4TH; REPLACE SIGNAL AT 9TH ` -1 <br />~-__ <br />Name: OR99:BARGER-WASHINGTON/JEFFERSON (EUGENE) Applicant: ODOT Key: 14559 --- <br />Hwy/St: PACIFIC HWY WEST ~ • -' <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: (, -., <br />Route: OR-99 <br />Planning: <br />Milepoints: <br />119.42 to 123.39 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LAN E MP Other: <br />$0 <br />$542,000 2005 <br />$765,000 2008 <br />$0 <br />$6,420,000 2010 STP $2,707,513 HSIP $1,361,721 BIKPED $706,200 HSIP $1,124,900 <br />$0 <br />ti J <br />,. <br />~. <br />i <br />_..~. <br />Total: $7,727.000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation ' <br />Description: <br />OVERLAY; SAFETY IMPROVEMENTS AT GARFIELD, FAIRFIELD, ROYAL; SIDEWALKS; REPAIR BR#02138 Work type 2: Safe ~ '? <br />Work type 3: Bicycle/Pedestrian `-- ~ <br />2OlO-2013 DRAFT STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 76 ~' <br />~i <br />