|
LANE COUNTY
<br />Name: OR58: SALT CREEK TUNNEL & HALF VIADUCTS Applicant: ODOT Key: 16035 '
<br />Hwy/St: WILLAMETTE ~
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: OR-58
<br />Planning:
<br />Milepoints:
<br />55.95 to 56.34 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />LANECO
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$4,001,000 2010 HBP $3,590,097
<br />$113,000 2011 HBP $101,395
<br />$292,000 2011 HBP $262,012
<br />$24,541,000 2012 HBP $22,020,639
<br />$0
<br />ll~
<br />`. ~_ J
<br />i
<br />Description: Total: $28.947.000 Status: Const. scheduled to begin in 2012 Work type: Bridee
<br />REPAIR CRACKEDTUNNEL LINER (02539); REPLACE BRIDGES (07185, 07186, 07187 & 07188)
<br />Name: OR58: EAGLE CREEK-SALT CREEK TUNNEL Applicant: ODOT Key: 14752
<br />Hwy/St: WILLAMETTE :. ~
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: i
<br />Route: OR-58
<br /> Planning:
<br />Milepoints:
<br />48.30 to 56.00 Design:
<br />ACT/AREA: Land Purchase:
<br />LANECO Utility Reloc:
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$179,000 2008
<br />$5,000 2010 NHS $4,487
<br />$0
<br />$3,768,000 2011 NHS $3,381,026
<br />$0
<br />_~
<br />_J
<br />_.
<br />- -.~
<br />Description: Total: 3 952 000 Status: Const. scheduled to begin in 2011 Work type: Pavement Preservation ^ - -1
<br />~:_~_/
<br />OVERLAY
<br />~_ ~
<br />',_~
<br />Name: OR69: DELTA HWY O'XING BR #09358 Applicant: ODOT Key: 16034
<br />Hwy/St: BELTLINE
<br />Route: OR-69 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ':~
<br />Milepoints: Planning:
<br />10.03 to 10.06 Design:
<br />ACT/AREA: Land Purchase:
<br />LANECO Utility Reloc:
<br />Construction:
<br />MPO:
<br />CENTRAL LANE MP Other:
<br />$0
<br />$361,000 2011 HBP $323,925
<br />$6,000 2012 HBP $5,384
<br />$0
<br />$1,662,000 2013 HBP $1,491,313
<br />$0
<br />~ ,
<br />I, ')
<br />~.
<br />Description: Total: $2,029.000 Status: Const. scheduled to begin in 2013 Work type: Bridee ,___~
<br />1
<br />DECK OVERLAY; REPAIR SPALLED RAIL PARAPETS; BRIDGE #09358 ~~..
<br />Name: OR99 @ 4TH AND 9TH SIGNALS (COTTAGE GROVE) Applicant: ODOT Key: 14781 i'_
<br />Hwy/St: GOSHEN-DIVIDE ` -
<br />OR 99 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~ -. ,.
<br />Route. -
<br />Planning:
<br />Milepoints:
<br />14.75 to 15.36 Design:
<br />ACT/AREA: Land Purchase:
<br />LANECO Utility Reloc:
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$65,000 2009
<br />$55,000 2009
<br />$0
<br />$592,000 2011 STP $531,202
<br />$0
<br />~. ,-
<br />1..
<br />~-
<br />...
<br />( i
<br />Description: Total: 712 000 Status: Const. scheduled to begin in 2011 Work type: Operations (~
<br />MODIFY SIGNAL AT 4TH; REPLACE SIGNAL AT 9TH ` -1
<br />~-__
<br />Name: OR99:BARGER-WASHINGTON/JEFFERSON (EUGENE) Applicant: ODOT Key: 14559 ---
<br />Hwy/St: PACIFIC HWY WEST ~ • -'
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: (, -.,
<br />Route: OR-99
<br />Planning:
<br />Milepoints:
<br />119.42 to 123.39 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />LANECO
<br /> Construction:
<br />MPO:
<br />CENTRAL LAN E MP Other:
<br />$0
<br />$542,000 2005
<br />$765,000 2008
<br />$0
<br />$6,420,000 2010 STP $2,707,513 HSIP $1,361,721 BIKPED $706,200 HSIP $1,124,900
<br />$0
<br />ti J
<br />,.
<br />~.
<br />i
<br />_..~.
<br />Total: $7,727.000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation '
<br />Description:
<br />OVERLAY; SAFETY IMPROVEMENTS AT GARFIELD, FAIRFIELD, ROYAL; SIDEWALKS; REPAIR BR#02138 Work type 2: Safe ~ '?
<br />Work type 3: Bicycle/Pedestrian `-- ~
<br />2OlO-2013 DRAFT STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 76 ~'
<br />~i
<br />
|