New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VARIOUS COUNTIES <br />Name: 2011 RURAL CORRIDOR ITS Applicant: ODOT Key: 15037 <br />Hwy/St: VARIOUS HIGHWAYS <br />R te• VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$150,000 2009 <br />$50,000 2010 STP $44,865 <br />$0 <br />$920,000 2011 STP $825,516 <br />$0 <br />Description: Total: 1 120 000 Status: Const. scheduled to begin in 2011 <br />ITS PROJECTS-VARIOUS RURAL LOCATIONS IN REG 1 <br />Work type: Onerations <br />Name: SULLPJAN'S GULCH TRAIL: E-BANK ESPLANADE TO 122ND Applicant: CITY OF PORTLAND Key: 15587 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 250 000 Status: Planning 2010 Work type: BicYCle/Pedestrian <br />REQUIRED PLANNING PRIOR TO ENGINEERING AND CONSTRUCTION PHASES <br />Name: METRO RTO PROGRAM 2010 Applicant: METRO Key: 15547 <br />xwyist: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: L and Purchase: <br />METROC Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 2 672 000 Status: Non-Construction Project 2010 Work type: Congestion Mgmt <br />REGIONAL TRAVEL OPTIONS PROGRAM OPERATIONS <br />Name: SOUTH CORRIDOR PHASE II (PE):PORTLAND TO MILWAUKIE Applicant: METRO Key: 15554 <br />Hwy/St: VARIOUS HIGHWAYS <br />R Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. -- <br />Planning: <br />Milepoints: <br />0.00 to O,Op Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br /> Construction: <br />MPO. <br />PORTLAND MPO Other: <br />Description: Total: 6 000 000 Status: Final Plan sched. to begin in 2010 Work type: Coneestion Memt <br />REQUIRED ELEMENT OF COMPETITIVE LRT FUNDING PROCESS <br />Name: METRO RTO PROGRAM 2011 Applicant: METRO Key: 15548 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROC Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $2,098.000 Status: Non-Construction Project 2011 Work type: Coneestion Memt <br />REGIONAL TRAVEL OPTIONS PROGRAM OPERATIONS <br />2010-2013 DRAFT STIP Www•oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.