New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WASHINGTON COUNTY <br />Name: US26: STACEY'S JUNCTION IMPROVEMENT Applicant: ODOT Key: 13957 <br />Hwy/St: SUNSET <br />R te• US-26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Ivlilepoints: <br />45.48 to 45.48 Design: <br />AC.P/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,188,000 2006 <br />$1,237,000 2008 <br />$0 <br />$9,575,000 2010 STP $4,467,657 OTIA III $2,585,250 OTHER $2,010,750 <br />$0 <br />Description: Total: $12,000,000 Status: Const. scheduled to begin in 2010 Work type: Modernization <br />INTERCHANGE IMPROVEMENTS <br />Name: US26: SUNSET HWY @ GLENCOE ROAD Applicant: ODOT Key: 12885 <br />Hwy/St: SUNSET <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />57.16 to 57.39 Design: <br />AC.1./AREA: L and Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 2 022 000 Status: Land Purchase 2010 Work type: Modernization <br />PE FOR REBUILD OF O'XING ADVANCED TO 'OS $522K & $1.2 MIL WASHINGTON COUNTY FUNDS <br />Footnote: PE PHASE ORIGINALLY 2007, ADVANCED TO 2005 <br />Name: US26: NW 185TH AVE - CORNELL ROAD Applicant: ODOT Key: 14070 <br />Hwy/St: SUNSET <br />R te• US-26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />64.30 to 65.91 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 _. _... <br />$1,306,000 2009 <br />$0 <br />$0 <br />$18,212,000 2013 STP $13,726,967 OTHER $2,913,920 <br />$0 <br />Description: Total: $19,518,000 Status: Const. scheduled to begin in 2013 Work type: Modernization <br />WIDEN US26 FROM OR217 INTERCH TO CORNELIUS PA SS EXIT <br />Name: US30:LOWER COLUMBIA RIVER HWY @ CORNELIUS PASS RD Applicant: ODOT Key: 16151 <br />Hwy/St: LOWER COLUMBIA RNER <br />R te• US-30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />13.15 to 13.31 Design: <br />ACT/AREA: L and Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$571,000 2010 HSIP $489,716 NHS $35,865 <br />$227,000 2011 HSIP $209,339 <br />$0 <br />$3,553,000 2012 HSIP $3,112,748 NHS $159,405 <br />$0 <br />Description: Total: $4,351.000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />INSTALL ITS; RT TURN CHANNELIZATION ON CORNELIUS PASS & US30 Work type 2: Pavement Preservation <br />Name: ROCK CREEK TRAIL: ORCHARD PARK - NW WILKINS ST Applicant: CITY OF HILLSBORO Key: 14437 <br />Hwy/St: <br />R ~ VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.P/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$168,000 2008 <br />$257,000 2009 <br />$0 <br />$0 <br />$998,000 2010 CMAQ $895,505 <br />$0 <br />Description: Total: $1,423.000 Status: Const. scheduled to begin in 2010 Work type: Bicycle/Pedestrian <br />MULTI-USE PATH THAT CONNECTS TO QUATAMA LRT STATION <br />2010-2013 DRAFT STIP www,oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.