WASHINGTON COUNTY <br />Name: OR8:TV HWY @ 178TH AVE Applicant: ODOT Key: 16144 <br />Hwy/St: TUALATIN VALLEY <br />R te• OR-08 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />6.17 to 6.35 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$131,000 2010 HSIP $120,808 <br />$34,000 2011 HSIP $31,355 <br />$250,000 2011 HSIP $230,550 <br />$815,000 2012 HSIP $736,561 STP $14,626 <br />$0 <br />Description: Total: $1.230,000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />PEDISTRIAN IMPROVEMENTS AND ILLUMINATION <br />Name: EAST BASELINE STREET: 10TH AVE TO 19TH AVE Applicant: CITY OF CORNELIUS Key: 15592 <br />Hwy/St: TUALATIN VALLEY <br />R te• OR-8 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />16.13 to 16.70 Design: <br />ACT/AREA: L and Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$501,000 2009 <br />$323,000 2010 CMAQ $289,828 <br />$0 <br />$2,778,000 2011 CMAQ $2,492,699 <br />$0 <br />Description: Total: 3 602 000 Status: Const. scheduled to begin in 2011 Work type: Bicvcle/Pedestrian <br />PEDESTRIAN AMENITIES, BIKE LANES, ON STREET PARKING <br />Name: OR8: DAIRY CREEK BRIDGE #00744B Applicant: ODOT Key: 14792 <br />Hwy/St: TUALATIN VALLEY <br />R to OR-8 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />14.21 to 14.41 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: ,Total: 1 922 000 Status: Const. scheduled to begin in 2011 Work type: Brid e <br />JOINT REPAIR; AC OVERLAY; RAIL RETROFIT & SEISMIC RETROFIT <br />Name: OR8: MINTER BR RD - MT VIEW LANE Applicant: ODOT Key: 15044 <br />Hwy/St: TUALATIN VALLEY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• OR-8 <br />ou . <br />Planning: <br />Milepoints: <br />11.28 to 17.8g Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 -- -- <br />$855,000 2009 <br />$24,000 2010 NHS $21,535 <br />$0 <br />$8,396,000 2011 NHS $7,081,707 HSIP $232,284 BIKPED $251,880 <br />$0 <br />Description: Total: 9 275 000 Status: Const. scheduled to begin in 2011 Work type: Pavement Preservation <br />PAVING Work type 2: Safe <br />Work type 3: Bicvcle/Pedestrian <br />Name: OR47 & E MAIN ST:SIDEWALK & LANDSCAPING (GASTON) Applicant: CITY OF GASTON Key: 15479 <br />Hwy/St: SUNSET <br />R te• OR-47 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 1 248 000 Status: Const. scheduled to begin in 2010 Work type: Enhancement <br />SIDEWALK/LANDSCAPING ENHANCEMENT <br />2010-2013 DRAFT STIP WWW.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 48 <br />