MULTNOMAH COUNTY r.
<br />Name: NE CULLY BLVD: NE PRESCOTT TO NE KILLINGSWORTH Applicant: CITY OF PORTLAND Key: 13506 ~
<br />Hwy/St: Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />'. , )
<br />Route: --
<br /> Planning:
<br />Milepoints:
<br />0.00 to 0.00 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />METROE
<br /> Construction:
<br />MPO:
<br />PORTLAND MPO Other:
<br />$168,000 2008
<br />$900,000 2008
<br />$144,000 2009
<br />$0
<br />$3,943,000 2010 STP-U $1,309,080 OTHER $2,484,090
<br />$0
<br />Description: Total: $5.155,000 Status: Const. scheduled to begin in 2010 Work type: Bicycle/Pedestrian 1
<br />GREEN STREET RETROFIT, BIKE LANES & SIDEWALKS J
<br />Footnote: CONSTRUCTION STP-U FED $ ALLOCATION $1,286,270
<br />Name: BROADWAY ST: WILLAMETTE R (BROADWAY) BR PAINTING Applicant: MUTLNOMAH COUNTY Key: 16196
<br />Hwy/St:
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: --
<br /> Planning:
<br />Milepoints:
<br />0.00 to 0.00 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />METROE
<br /> Construction:
<br />MPO:
<br />PORTLAND MPO Other:
<br />,.
<br />,.,.~
<br />_:_
<br />Description: Total: $10,500,000 Status: Const. scheduled to begin in 2013 Work type: Bridee ,----)
<br />PAINT TRUSSES ON SPANS 2, 3 AND 7; BRIDGE #06757
<br />,.
<br />Name: N VANCOUVER AVE: COLUMBIA SLOUGH BRIDGE(PORTLAND) Applicant: CITY OF PORTLAND Key: 14979 ( ~
<br />Hwy/St:
<br />Totat Cost: Year: 1st Fund: Share: 2nd Fund:. Share: 3rd Fund: Share: Prior Yr: Share: ~: ~~
<br />Route: --
<br /> Planning:
<br />Milepoints.
<br />0.46 to 0.53 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />METROC
<br /> Construction:
<br />MPO:
<br />PORTLAND MPO Other:
<br />$0
<br />$1,256,000 2010 OTHER $1,256,000
<br />$140,000 2010 OTHER $140,000
<br />$0
<br />$9,028,000 2011 OTHER $9,028,000
<br />$0
<br />_~
<br />L_ J
<br />~. ~~~
<br />+,
<br />,~
<br />Description: Total: $10.424.000 Status: Const. scheduled to begin in 2011 Work type: Bride _
<br />~~~..)
<br />REPLACE EXISTING BRIDGE #001696
<br />__~
<br />i~
<br />Name: MORRISON BRIDGE REHABILITATION Applicant: MULTNOMAH COUNTY Key: 14980 ~ ;. >f
<br />Hwy/St: ___
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: (. ~,
<br />Route: --
<br /> Planning:
<br />Milepoints:
<br />0.05 to 0.37 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />METROC
<br /> Construction:
<br />MPO:
<br />PORTLAND MPO Other:
<br />~ ~ ~J
<br />~~~ )
<br />,_
<br />i
<br />_.__l
<br />Total: $10,201.000 Status: Const. scheduled to begin in 2011 Work type: Bridge ~
<br />Description: ~
<br />BRIDGE #08589 REHABILITATION ~ 1
<br />~__ ~
<br />Name: BEAVER CR CULVERTS(TROUTDALE RD/COCHRAN/STARK ST) Applicant: MULTNOMAH COUNTY Key: 14438 ~- --,
<br />Hwy/St: ~
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: --
<br /> Planning:
<br />Milepoints:
<br />0.00 to 0.00 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />METROE
<br /> Construction:
<br />MPO:
<br />PORTLAND MPO Other:
<br />$0
<br />$367,000 2008
<br />$100,000 2009
<br />$0
<br />$4,403,000 2010 STP-U $869,179 OTHER $3,434,340
<br />$0
<br />t ~%
<br />(.~ __
<br />Description: Total: $4.870,000 Status: Const. scheduled to begin in 2010 Work type: Culvert ~
<br />3 CULVERT REPLACEMENTS AND ENVIRONMENTAL RESTORATION ~.. \~
<br />Footnote: TOTAL STP-U FED ALLOCATION: $1,000,000
<br />~ ~~
<br />2010-2013 DRAFT STIP ~'~'WOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 45