MULTNOMAH COUNTY r. <br />Name: NE CULLY BLVD: NE PRESCOTT TO NE KILLINGSWORTH Applicant: CITY OF PORTLAND Key: 13506 ~ <br />Hwy/St: Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />'. , ) <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROE <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$168,000 2008 <br />$900,000 2008 <br />$144,000 2009 <br />$0 <br />$3,943,000 2010 STP-U $1,309,080 OTHER $2,484,090 <br />$0 <br />Description: Total: $5.155,000 Status: Const. scheduled to begin in 2010 Work type: Bicycle/Pedestrian 1 <br />GREEN STREET RETROFIT, BIKE LANES & SIDEWALKS J <br />Footnote: CONSTRUCTION STP-U FED $ ALLOCATION $1,286,270 <br />Name: BROADWAY ST: WILLAMETTE R (BROADWAY) BR PAINTING Applicant: MUTLNOMAH COUNTY Key: 16196 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROE <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />,. <br />,.,.~ <br />_:_ <br />Description: Total: $10,500,000 Status: Const. scheduled to begin in 2013 Work type: Bridee ,----) <br />PAINT TRUSSES ON SPANS 2, 3 AND 7; BRIDGE #06757 <br />,. <br />Name: N VANCOUVER AVE: COLUMBIA SLOUGH BRIDGE(PORTLAND) Applicant: CITY OF PORTLAND Key: 14979 ( ~ <br />Hwy/St: <br />Totat Cost: Year: 1st Fund: Share: 2nd Fund:. Share: 3rd Fund: Share: Prior Yr: Share: ~: ~~ <br />Route: -- <br /> Planning: <br />Milepoints. <br />0.46 to 0.53 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$1,256,000 2010 OTHER $1,256,000 <br />$140,000 2010 OTHER $140,000 <br />$0 <br />$9,028,000 2011 OTHER $9,028,000 <br />$0 <br />_~ <br />L_ J <br />~. ~~~ <br />+, <br />,~ <br />Description: Total: $10.424.000 Status: Const. scheduled to begin in 2011 Work type: Bride _ <br />~~~..) <br />REPLACE EXISTING BRIDGE #001696 <br />__~ <br />i~ <br />Name: MORRISON BRIDGE REHABILITATION Applicant: MULTNOMAH COUNTY Key: 14980 ~ ;. >f <br />Hwy/St: ___ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: (. ~, <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.05 to 0.37 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />~ ~ ~J <br />~~~ ) <br />,_ <br />i <br />_.__l <br />Total: $10,201.000 Status: Const. scheduled to begin in 2011 Work type: Bridge ~ <br />Description: ~ <br />BRIDGE #08589 REHABILITATION ~ 1 <br />~__ ~ <br />Name: BEAVER CR CULVERTS(TROUTDALE RD/COCHRAN/STARK ST) Applicant: MULTNOMAH COUNTY Key: 14438 ~- --, <br />Hwy/St: ~ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROE <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$367,000 2008 <br />$100,000 2009 <br />$0 <br />$4,403,000 2010 STP-U $869,179 OTHER $3,434,340 <br />$0 <br />t ~% <br />(.~ __ <br />Description: Total: $4.870,000 Status: Const. scheduled to begin in 2010 Work type: Culvert ~ <br />3 CULVERT REPLACEMENTS AND ENVIRONMENTAL RESTORATION ~.. \~ <br />Footnote: TOTAL STP-U FED ALLOCATION: $1,000,000 <br />~ ~~ <br />2010-2013 DRAFT STIP ~'~'WOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 45 <br />