New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MULTNOMAH COUNTY ~: <br />Name: US26: SPRINGWATER AT-GRADE INTERSECTION Applicant: ODOT Key: 15773 ',. _ :' <br />Hwy/St: MT HOOD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-26 <br /> Planning: <br />Milepoints: <br />16.24 to 16.24 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />l <br />,_ J <br />Description: Total: 3 000 000 Status: Const. scheduled to begin in 2010 Work type: Modernization ) <br />CONSTRUCT AT-GRADE INTERSECTION \ <br />Name: US 26: SE 122ND TO SE 136TH Applicant: ODOT Key: 15051 , <br />Hwy/St: MT HOOD <br />2 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US- 6 <br />Planning: <br />Milepoints: <br />7.21 to 7.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$500,000 2009 <br />$1,183,000 2010 HSIP $1,090,963 <br />$0 <br />$3,762,000 2011 STP $540,103 HSIP $2,463,215 BIKPED $489,060 <br />$0 <br />._ <br />..- _~ <br />Description: Total: $5,445,000 Status: Const. scheduled to begin in 2011 Work type: Safe <br />INSTALL 3RD TURN LANE; SHOULDERS; SIDEWALKS &CROSSWALKS Work type 2: Bicycle/Pedestrian -- <br />~ , <br />Name: US 30 BYPASS: NE 122ND - NE 141ST Applicant: ODOT Key: 15068 <br />Hwy/St: NORTHEAST PORTLAND ~ " ~ <br />S Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: U -30 <br /> Planning: <br />Milepoints: <br />12.00 to 13.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROE <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$492,000 2008 <br />$113,000 2009 <br />$0 <br />$3,260,000 2010 HSIP $2,164,588 STP $526,536 BIKPED $326,000 <br />$0 <br />'~_ _~ <br />,, <br />~ .~ <br />~' <br />'_ a <br />Description: Total: 3 865 000 Status: Const. scheduled to begin in 2010 Work type: Safe __, <br />INSTALL 3RD TURN LANE; SHOULDERS; SIDEWALKS &X-INGS Work type 2: Pavement Preservation <br />Work type 3: Bicycle/Pedestrian ' _ '~ <br />~ ,. <br />Name: US30B: NE 60TH AVE - NE 82ND AVE Applicant: ODOT Key: 15050 ~ , <br />Hwy/St: NORTHEAST PORTLAND `- ' <br />US 30B Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~- 1 <br />Route: - <br />Planning: <br />Milepoints: <br />9.00 to 10.00 Design: <br />ACT/AREA: Land Purchase: <br />METROC Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MP O Other: <br />$0 <br />$180,000 2009 <br />$0 <br />$0 <br />$1,015,000 2010 STP $810,576 HSIP $56,162 BIKPED $50,750 <br />$0 <br />(.- 1 <br />r _- <br />~ ~ <br />'~ <br />1 <br />Description: Total: $1,195,000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation <br />OVERLAY Work type 2: Safe i___ .~ <br />Work type 3: Bicycle/Pedestrian <br />~. _ <br />Name: MAX TRAIL: CLEVELAND STATION -RUBY JCT Applicant: CITY OF GRESHAM Key: 14413 ,~- , <br />Hwy/St: ~ -' <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: __. <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />~l <br />~~ ~' <br />~~ ~ <br />i., .. <br />Description: Total: $1.385.000 Status: Const. scheduled to begin in 2011 Work type: Bicvcle/Pedestrian ` ' ' <br />FINAL ENGR & CONST OF REMAINING SECTIONS OF PATH ~ :~' <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.