New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLUMBIA COUNTY <br />Name: OR202: NEHALEM RIVER (BANZER) BRIDGE #03140A Applicant: ODOT Key: 14797 _) <br />Hwy/St: NEHALEM <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-202 <br />Planning: <br />Milepoints: <br />43.60 to 43.80 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$550,000 2007 <br />$261,000 2008 <br />$0 <br />$5,300,000 2010 HBP $1,284,036 HBP $3,471,654 <br />$0 <br />Description: Total: 6 111 000 Status: Const. scheduled to begin in 2010 Work type: Bridee - , <br />REPLACE BRIDGE #03140A <br />i <br />Name: US30: B STREET BIKE/PED PATH Applicant: CITY OF RAINIER Key: 11196 ;' <br />Hwy/St: LOWER COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-30 <br />Planning: <br />Milepoints: <br />46.62 to 47.34 Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$355,000 2001 <br />$118,000 2003 <br />$0 <br />$649,000 2010 BIKPED $51,920 ENHANC $535,760 <br />$0 <br />~- ~~ <br />_~ <br />,..,': <br />Description: Total: 1 122 000 Status: Const. scheduled to begin in 2010 Work type: Enhancement ,_ <br />CONSTRUCT AND WIDEN SIDEWALKS, ADD LANDSCAPING AND PED. AMENITIES. Work type 2: Bicycle/Pedestrian <br />Name: BEAVER FALLS ROAD GUARDRAIL REPLACEMENT Applicant: COLUMBIA COUNTY Key: 11193 )/ <br />Hwy/St: OLD OREGON TRAIL <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ; - ~ <br />Route: US-30 <br /> Planning: <br />Milepoints: <br />6.07 to 8.50 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />~ : ~ <br />;. _~ <br />~ _1 <br />~, <br />Description: Total: 1 293 000 Status: Const. scheduled to begin in 2010 Work type: Enhancement <br />RESTORE/REPLACE HISTORIC ROCK GUARDRAIL. ~ <br />,_ ~. <br />I ..~ <br />Name: US30: (LOWER) COLUMBIA RIVER HWY @ VAN STREET Applicant: ODOT Key: 12834 -- ~} <br />Hwy/St: NEHALEM <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~~ -- <br />Route: US-30 <br /> Planning: <br />Milepoints: <br />60.94 to 61.20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$416,000 2008 <br />$70,000 2012 STP $62,811 <br />$0 <br />$5,426,000 2010 STP $4,868,750 <br />$0 <br />~. <br /> <br />~ ~ <br />Description: Total: 5 912 000 Status: Const. scheduled to begin in 2010 Work type: Modernization <br />CONSTRUCT LEFT TURN LANE; WIDEN ROADWAY; PAVEMENT PRESERVATION ~..-__i <br />Name: US30:LOWER COLUMBIA RIVER HWY @ VAN STREET Applicant: ODOT Key: 15530 <br />Hwy/St: MT HOOD ~_' <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />r <br />Route: US-30 <br />Planning: <br />Milepoints. <br />60.83 to 61.76 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$916,000 2007 <br />$70,000 2008 <br />$0 <br />$4,976,000 2010 STP $3,929,169 OTIAIII $497,600 HSIP $91,777 <br />$0 <br />~.. '' <br />t _~ <br />l <br />Description: Total: 5 962 000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation ~ <br />Work a 2: Bride ( ,~ <br />REPAIR AND WIDEN BR #07519; CONSTRUCT LFT TURN LANE; WIDEN RDWAY; PAVE PRES ~ -g- ~ .. <br />_, <br />Footnote: REGION/OTIA BUNDLE PROJECT Work type 3: Safe <br />2010-2013 DRAFT STIP www•oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 37 ~ ~` <br />
The URL can be used to link to this page
Your browser does not support the video tag.