CLACKAMAS COUNTY <br />Name: I-205: WILLAMETTE R (GEO ABERNETHY) BRIDGE #09403 Applicant: ODOT Key: 14799 <br />Hwy/St: EAST PORTLAND <br />R te• I-205 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />8.78 to 9.28 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $14,198,000 Status: Const. scheduled to begin in 2010 Work type: Bridle <br />DECK OVERLAY; REPAIR DECK JOINTS <br />Name: I-205 CABLE BARRIER Applicant: ODOT Key: 16152 <br />Hwy/St: EAST PORTLAND <br />R te• I-205 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />15.87 to 17.80 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 657 000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />INSTALL MEDIAN CABLE BARRIER IN MISSING SECTIONS <br />Name: OR99E: PARTIAL VIADUCT (SB OVER HILLSIDE) BR 07164 Applicant: ODOT Key: 14798 <br />Hwy/St: PACIFIC HWY EAST <br />R OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. <br />Planning: <br />Milepoints: <br />13.76 to 13.96 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 604 000 Status: Const. scheduled to begin in 2010 Work type: Bridge <br />BRIDGE REHAB <br />Name: OR-99E BRIDGE AT KELLOG LAKE Applicant: CITY OF MILWAUKIE Key: 15598 <br />Hwy/St: PACIFIC HWY EAST <br />R te• OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT,/AREA: Land Purchase: <br />METROS Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 1 176 000 Status: Final Plan sched. to begin in 2010 Work type: Culvert <br />REMOVE CULVERT, RESTORE NATURAL HYDRAULIC FUNCTION OF CREEK <br />Name: OR99E:MP14.9 -TERRITORIAL ROAD Applicant: ODOT Key: 16147 <br />Hwy/St: PACIFIC HWY EAST <br />R te• OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />14.90 to 18.26 Design: <br />ACT/AREA: L and Purchase: <br />METROS Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$471,000 2010 NHS $371,913 HSIP $52,123 <br />$0 <br />$0 <br />$4,891,000 2012 NHS $3,862,051 STP $526,643 <br />$0 <br />Description: Total: $5,362.000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />GRIND AND INLAY Work type 2: Safe <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 30 <br />