New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~/ <br />STATEWIDE <br />Name: I-5: CONCRETE REPAIRS Applicant: ODOT Key: 16195 '.__._) <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~ <br />Route: -- <br />Planning: <br />IVlllepOlnts: <br />0.00 to 0.00 Design: <br />AC.T/AREAc Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />1 <br />-~ <br />Description: Total: $2,100,000 Status: Pooled Funding 2012 Work type: Pavement Preservation ~ <br />J <br />CONCRETE REPAIRS ON INTERSTATE HIGHWAYS <br />J <br />Name: 2013 INTERSTATE SIGN REPLACEMENT PROJECT Applicant: ODOT Key: 16194 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />STATEWIDE Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />l <br />Description: Total: $2,140,000 Status: Pooled Funding 2013 Work type: Pavement Preservation <br />REPLACE SIGNS ON INTERSTATE HIGHWAYS <br />_~ <br />Name: 2012 INTERSTATE SIGN REPLACEMENT PROJECT Applicant: ODOT Key: 16193 ;' <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />,) <br />__ <br />\I <br />,_ <br />~__ ~ <br />~. <br />Description: Total: 2 200 000 Status: Pooled Funding 2012 Work type: Pavement Preservation <br />;, _l <br />REPLACE SIGNS ON INTERSTATE HIGHWAYS <br />~~ <br />Name: 2014 PE & RW BUCKET INTERSTATE MAINTENANCE PROGRAM Applicant: ODOT Key: 16262 ~ ~, <br />Hwy/St: VARIOUS HIGHWAYS ~ ' <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: - -~ <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />~. <br />i.1 <br />l,__.l <br />~ .~ <br />__ ,, <br />Description: Total: $4,000,000 Status: Pooled Funding 2012 Work type: Pavement Preservation <br />PE & RW POOL FOR FUTURE PROJECTS ~-- ' <br />Name: STATE BRIDGE INSPECTION MGMT & LOAD RATING 2011-13 Applicant: ODOT Key: 14944 -- - <br />Hwy/St: VARIOUS HIGHWAYS ~- <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: , _ , <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />_. <br />~ __.. <br />(_ .. <br />Description: Total: $10,240,000 Status: Planning 2011 Work type: Planning <br />STATE BRIDGE INSPECTION MANAGEMENT SYSTEM & LOAD RATING 2011-2013 ~ . \~' <br />i <br />ZOlO-2013 DRAFT STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 177 `~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.