VARIOUS COUNTIES <br />Name: REGION 5 WEIGH STATION SCALE PULL OUTS Applicant: ODOT Key: 14693 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$40,000 2008 <br />$1,000 2009 <br />$0 <br />$259,000 2010 STP $232,401 <br />$0 <br />Description: Total: 300 000 Status: Const. scheduled to begin in 2010 <br />CONSTRUCT PORTABLE SCALE PULL-OUT SITES AT VARIOUS LOCATIONS <br />Work type: Unerattons <br />Name: REGION 5 OPERATIONS PE RESERVE Applicant: ODOT Key: 16026 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$500,000 2012 STP $448,650 <br />$0 <br />$0 <br />$0 <br />$0 <br />Description: Total: 500 000 Status: Pooled Funding 2012 <br />POOL <br />Work type: Uneranons <br />Name: REGION 5 DURABLE STRIPING /RUMBLE STRIPS Applicant: ODOT Key: 14692 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC'T/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$40,000 2008 <br />$0 <br />$0 <br />$138,000 2010 STP $123,827 <br />$0 <br />Description: Total: 178 000 Status: Advanced from FY 2010 Work type: Operations <br />INSTALL DURABLE STRIPING AND MARKING AT LOCATIONS THROUGHOUT REGION <br />Name: REGION 5 PRESERVATION PE RESERVE Applicant: ODOT Key: 16027 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.f/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 25 000 Status: Pooled Funding 2012 Work type: Pavement Preservation <br />POOL <br />Name: REGION 5 SAFETY PE RESERVE Applicant: ODOT Key: 16028 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 262 000 Status: Pooled Funding 2012 Work type: Safe <br />POOL <br />2010-2013 DRAFT STIP ~'~'•oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 161 <br />