New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VARIOUS COUNTIES <br />Name: US 730: IRRIGON - UMATILLA SECTION Applicant: ODOT Key: 13607 <br />Hwy/St: COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-730 <br />Planning: <br />Milepoints. <br />176.61 to 182.60 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$348,000 2007 <br />$310,000 2008 <br />$100,000 2008 <br />$2,742,000 2010 STP $1,131,782 HSIP $1,365,483 <br />$0 <br />Description: Total: $3.500.000 Status: Const. scheduled to begin in 2010 Work type: Modernization <br />RECONSTRUCT, ADD TURN LANES Work type 2: Safe <br />Name: REGION 5 SNOW FENCES 2013 Applicant: ODOT Key: 16015 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.1./AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$62,000 2011 STP $55,633 <br />$188,000 2012 STP $168,692 <br />$0 <br />$250,000 2013 STP $224,325 <br />$0 <br />Description: Total: 500 000 Status: Const. scheduled to begin in 2013 Work type: Operations <br />INSTALL SNOW FENCES AT VARIOUS SITES. <br />Name: REGION 5 SNOW FENCES Applicant: ODOT Key: 14700 <br />Hwy/St: VARIOUS HIGHWAYS <br />VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$40,000 2008 <br />$10,000 2009 <br />$0 <br />$200,000 2010 STP $179,460 <br />$0 <br />Description: Total: 250 000 Status: Const. scheduled to begin in 2010 Work type: Operations <br />CONSTRUCT SNOW FENCES AT VARIOUS LOCATIONS <br />Name: REGION 5 SNOW ZONE SIGNS AND HAR SITES Applicant: ODOT Key: 16011 <br />Hwy/St: VARIOUS HIGHWAYS <br />VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$92,000 2010 STP $82,552 <br />$0 <br />$0 <br />$726,000 2012 STP $651,440 <br />$0 <br />Description: Total: 818 000 Status: Const. scheduled to begin in 2012 Work type: Onerations <br />INSTALL AND/OR RETROFIT SNOW ZONE SIGNS, INSTALL HAR AT ONTARIO, BAKER, MILTON-FREEWATER. <br />Name: REGION 5 CHAIN UP AREAS /CLIMBING LANE Applicant: ODOT Key: 16010 <br />Hwy/St: VARIOUS HIGHWAYS <br />• VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$88,000 2010 STP $78,962 <br />$0 <br />$0 <br />$1,534,000 2012 STP $1,376,458 <br />$0 <br />Description: Total: 1 622 000 Status: Const. scheduled to begin in 2012 Work type: Operations <br />INSTALL NEW OR EXTEND EXISTING CHAIN UP AREAS OR CLIMBING LANE ALONG I-84. <br />201-213 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.