BAKER COUNTY <br />Name: OR86: BAKER-COPPERFIELD HWY GUARDRAIL (PHASE 1) Applicant: ODOT Key: 14688 <br />Hwy/St: BAKER-COPPERFIELD <br />• OR 86 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />40.00 to 47.00 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$40,000 2009 <br />$10,000 2010 HSIP $9,222 <br />$0 <br />$450,000 2012 HSIP $414,990 <br />$0 <br />Description: Total: 500 000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />1 OF 6 PHASES TO REPLACE DEFICIENT GUARDRAIL <br />Name: US30: BURNT RIVER (LIME) BRIDGE #01788 Applicant: ODOT Key: 16024 <br />Hwy/St: HUNTINGTON <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />0.44 to 0.48 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$359,000 2010 HBP $322,131 <br />$14,000 2010 HBP $12,562 <br />$0 <br />$2,166,000 2012 HBP $1,943,552 <br />$0 <br />Description: Total: $2,539.000 Status: Const. scheduled to begin in 2012 Work type: Bridle <br />REPLACE BRIDGE #01788 <br />Name: US30: BURNT RIVER & UPRR BRIDGE #00700 Applicant: ODOT Key: 14695 <br />Hwy/St: HUNTINGTON <br />S 0 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: U -3 <br />Planning: <br />Milepoints: <br />2.65 to 2,85 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $1,954,000 Status: Const. scheduled to begin in 2010 Work type: Bridle <br />DECK OVERLAY; RAIL RETROFIT; REPAIR GIRDERS, CAPS, JOINTS; REPAIR TRUSS & BEARINGS <br />Name: US30: POCOHONTAS RD - JCT OR 7 (BAKER CITI~ Applicant: ODOT Key: 16014 <br />Hwy/St: LA GRANDE-BAKER <br />US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: - <br />Planning: <br />Milepoints: <br />49.95 to 51.79 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 2 042 000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />PAVEMENT PRESERVATION <br />Name: THIRD ST: US-30 -SCHOOL ST SIDEWALKS (HAINES) Applicant: CITY OF HAINES Key: 15481 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 379 000 Status: Const. scheduled to begin in 2010 Work type: Enhancement <br />SIDEWALK ENHANCEMENT PROJECT <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 150 <br />