KLAMATH COUNTY <br />Name: OR39: LINK RIVER BRIDGE #01579 (ICI.AMATH FALLS) Applicant: ODOT Key: 16104 <br />Hwy/St: KLAMATH FALLS-LAKEVIEW <br />R te• OR-39 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.04 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO. <br />Non-MPO Other: <br />$0 <br />$231,000 2011 HBP $207,276 <br />$47,000 2012 HBP $42,173 <br />$59,000 2012 HBP $52,941 <br />$2,164,000 2013 HBP $1,941,757 <br />$0 <br />Description: Total: 2 501 000 Status: Const. scheduled to begin in 2013 Work type: Bridee <br />DECK OVERLAY; REPAIR CRACKED SUPERSTRUCTURE & SUBSTRUCTURE BRIDGE 01579 <br />Name: OR39: MATNEY - MERRIL N CITY LIMITS Applicant: ODOT Key: 16200 <br />Hwy/St: KLAMATH FALLS-MALIN <br />R te• OR-39 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />6.28 to 13.59 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$629,000 2010 NHS $564,402 <br />$614,000 2011 NHS $550,942 <br />$63,000 2012 NHS $56,530 <br />$5,283,000 2012 NHS $4,218,988 HSIP $487,198 STP $47,404 <br />$0 <br />Description: Total: 6 589 000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />PAVEMENT PRESERVATION, T-UP INTERSECTION, ADD RIGHT TURN DECEL LANE Work type 2: Safe <br />Work type 3: Operations <br />Name: OR140: BNSF (DAIRY) BRIDGE REPLACEMENT Applicant: ODOT Key: 12740 <br />Hwy/St: KLAMATH FALLS-LAKEVIEW <br />R te• OR-140 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />18.29 to 18.49 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 I <br />$370,000 2009 <br />$97,000 2010 HBP $87,038 <br />$0 <br />$2,012,000 2011 HBP $1,805,368 <br />$0 <br />Description: Total: 2 479 000 Status: Const. scheduled to begin in 2011 Work type: Bridee <br />REPLACE BRIDGE #02147 <br />Name: OR39 @ GETTLE (KLAMATH FALLS) <br />Hwy/St: <br />Route: <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO. <br />Non-MPO Other: <br />Description: Total: <br />INTERSECTION IMPROVEMENT <br />Applicant: ODOT <br />Key: 16241 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />$0 <br />$44,000 2010 STP $39,481 <br />$5,000 2010 STP $4,487 <br />$5,000 2011 STP $4,487 <br />$479,000 2012 STP $429,807 <br />$0 <br />533 000 Status: Const. scheduled to begin in 2012 <br />Work type: Operations <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 140: <br />