JEFFERSON COUNTY <br />Name: US26 @ GUMWOOD LANE (MADRAS) Applicant: ODOT Key: 14936 <br />Hwy/St: WARM SPRINGS <br />R te• US-26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />110.60 to 111 .80 Design: <br />ACT/AREA: Land Purchase: <br />COACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$218,000 2008 <br />$124,000 2009 <br />$36,000 2010 HSIP $33,199 <br />$1,401,000 2010 HSIP $1,292,002 <br />$0 <br />Description: Total: 1 779 000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />ACCESS MANAGEMENT AT BOTH GUMWOOD INTERSECTIONS, REALIGN & CHANNELIZE COLUMBIA DRIVE <br />Name: US97 @ CHERRY LANE (MADRAS) Applicant: ODOT Key: 14939 <br />Hwy/St: THE DALLES-CALIFORNIA <br />R te• US-97 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />89.58 to 89.75 Design: <br />ACT/AREA: Land Purchase: <br />COACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$218,000 2008 <br />$386,000 2009 <br />$37,000 2010 HSIP $34,121 <br />$877,000 2010 HSIP $808,769 <br />$0 <br />Description: Total: 1 518 000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />REALIGNMENT & CHANNELIZATION <br />Name: CULVER HWY: NORTH UNIT CANAL BRIDGE #31C98 Applicant: JEFFERSON COUNTY Key: 16051 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />4.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />COACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$221,000 2012 HBP $198,303 <br />$35,000 2012 HBP $31,406 <br />$0 <br />$1,070,000 2013 HBP $960,111 <br />$0 <br />Description: Total: 1 326 000 Status: Const. scheduled to begin in 2013 Work type: Bridee <br />REPLACE BRIDGE #31C98 <br />Name: OR361: A ST -EST SIDEWALK/STREETSCAPE (CULVER) Applicant: CITY OF CULVER Key: 15478 <br />Hwy/St: CULVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />COACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 892 000 Status: Const. scheduled to begin in 2010 Work type: Enhancement <br />SIDEWALK/STREETSCAPE ENHANCEMENT PROJECT <br />2010-2013 DRAFT STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 138 <br />