New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VARIOUS COUNTIES <br />Name: OR 42: COUNTY LINE CURVES ENVIRONMENTAL ASSESSMENT Applicant: ODOT Key: 13787 <br />Hwy/St: COOS BAY-ROSEBURG <br />• OR 42 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />41.00 to 47.00 Design: <br />AC.I./AREA: Land Purchase: <br />SWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 2 500 000 Status: Const. scheduled to begin in 2012 Work type: Modernization <br />ENVIRONMENTAL ASSESMENT TO STRAIGHTEN COUNTY LINE CURVES; CONSTRUCT FIRST PHASE. <br />Name: US 101 CULVERTS Applicant: ODOT Key: 14989 <br />Hwy/St: OREGON COAST <br />R te• US-101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />SWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$75,000 2009 <br />$0 <br />$0 <br />$425,000 2010 STP $381,353 <br />$0 <br />Description: Total: 500 000 Status: Const. scheduled to begin in 2010 Work type: Onerations <br />REPAIR/REPLACE HIGHWAY CULVERTS <br />Name: OR230/OR138:NORTH UMPQUA-UPPER ROGUE B520 Applicant: ODOT Key: 14608 <br />Hwy/St: VARIOUS HIGHWAYS <br />R te• VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $13.987.000 Status: Const. scheduled to begin in 2010 Work type: Bridee <br />REPAIR BRIDGES 02496, 07904, 16861 & REPLACE BRIDGE 03461 <br />Name: REGION 3 MODERNIZATION PE & RW IN 2012 Applicant: ODOT Key: 13848 <br />Hwy/St: VARIOUS HIGHWAYS <br />R te• VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 500 000 Status: Pooled Funding 2012 Work type: Modernization <br />FOR FUTURE MODERNIZATION PROJECTS <br />Name: REGIONWIDE TRAFFIC SIGNAL UPGRADES Applicant: ODOT Key: 14987 <br />Hwy/St: VARIOUS HIGHWAYS <br />R te• VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$150,000 2008 <br />$100,000 2009 <br />$0 <br />$750,000 2011 STP $672,975 <br />$0 <br />Description: Total: $1.000.000 Status: Const. scheduled to begin in 2011 <br />UPGRADE TRAFFIC SIGNALS <br />Work type: Onerations <br />2010-2013 DRAFT STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.