New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOSEPHINE COUNTY <br />Name: I-5 TRUCK CLIMBING LANES Applicant: ODOT Key: 16213 <br />Hwy/St: PACIFIC <br />R t • I-5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou e. <br />Planning: <br />Milepoints: <br />65.00 to 80.00 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$0 <br />$0 <br />$0 <br />$2,000 2013 STP $1,184 HSIP $627 <br />$0 <br />Description: Total: 2 000 Status: Const. scheduled to begin in 2013 Work type: Operations <br />BUCKET FUND FOR A CLIMBING LANE ON I-5 BETWEEN MP 65 AND MP 80 Work type 2: Safe <br />Name: I-5 @ MP74 SAFETY IMPROVEMENTS Applicant: ODOT Key: 13777 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• I-5 <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$100,000 2008 <br />$0 <br />$0 <br />$1,100,000 2010 HEP $990,000 <br />$0 <br />Description: Total: 1 200 000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />REPLACE PAVING, SUPERELEVATION & DRAINAGE <br />Name: I-5 TRUCK CLIMBING LANES: SEXTON TO STAGE PASS Applicant: ODOT Key: 14990 <br />Hwy/St: PACIFIC <br />R 1-5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. <br />Planning: <br />Milepoints: <br />60.00 to 80.00 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$225,000 2008 <br />$75,000 2009 <br />$100,000 2009 <br />$1,600,000 2011 STP $890,122 HSIP $560,698 <br />$0 <br />Description: Total: $2,000,000 Status: Const. scheduled to begin in 2011 <br />ADD TRUCK CLIMBING LANES FROM SEXTON SUMMIT TO STAGE SUMMIT <br />Work type: Safe <br />Work type 2: Onerations <br />Name: OR 238 @ JAYNES DRIVE Applicant: ODOT Key: 14991 <br />Hwy/St: JACKSONVILLE <br />R te• OR-238 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />4.17 to 4.37 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$150,000 2008 <br />$400,000 2009 <br />$50,000 2009 <br />$900,000 2011 HSIP $829,980 <br />$0 <br />Description: Total: $1.500.000 Status: Const. scheduled to begin in 2011 <br />CONSTRUCT LEFT TURN LANE ON OR 238 <br />Work type: Safe <br />Name: US199:APPLEGATE RIVER & BALM SLOUGH (#07958&08043) Applicant: ODOT Key: 16039 <br />Hwy/St: REDWOOD <br />R te• US-199 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />6.80 to 7.02 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,002,000 2011 HBP $899,095 <br />$71,000 2012 HBP $63,708 <br />$0 <br />$14,091,000 2013 HBP $12,643,854 <br />$0 <br />Description: Total: $15.164,000 Status: Const. scheduled to begin in 2013 <br />REPLACE BRIDGE 07958 & ADJOINING CULVERT (08043) ON NEW ALIGNMENT. <br />Work type: Bridee <br />2010-2013 DRAFT STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.