JACKSON COUNTY <br />Name: OR 62: POPLAR - AVE H Applicant: oDOT Key: 16204 <br />Hwy/St: CRATER LAKE <br />Route• OR-62 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Milepoints: <br />Planning: <br />0.89 to 7,32 Design: <br />AC.1./AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />ROGUE VALLE Y MP Other: <br />$0 ', <br />$373,000 2010 NHS $334,693 <br />$0 <br />$1,000 2012 NHS $897 <br />$4,662,000 2012 NHS $4,183,213 <br />$0 <br />Description: Total: 5 036 000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />GRIND/INLAY AND OVERLAY PAVEMENT <br />Name: OR 62 @ ROLLING HILLS DRIVE & AT BARYON ROAD Applicant: ODOT Key: 16206 <br />Hwy/St: CRATER LAKE <br />Route• OR-62 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br /> Planning: <br />Milepoints: <br />10.90 to 11.30 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />ROGUE VALLEY MP Other: <br />$0 <br />$98,000 2011 HSIP $90,376 <br />$12,000 2012 HSIP $11,066 <br />$0 <br />$1,782,000 2013 HSIP $1,643,360 <br />$0 <br />Description: Total: $1,892,000 Status: Const. scheduled to begin in 2013 Work type: Safe <br />INSTALL TWO WAY CENTER LEFT TURN LANE BETWEEN BARYON AND ROLLING HILLS <br />Name: OR 99: RAPP ROAD TO VALLEY VIEW PAVING Applicant: ODOT Key: 15008 <br />Hwy/St: ROGUE VALLEY <br />Route• OR-99 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br /> Planning: <br />Milepoints: <br />14.50 to 17.20 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />ROGUE VALLEY MP Other: <br />$0 <br />$200,000 2009 <br />$0 <br />$50,000 2010 NHS $44,865 <br />$1,550,000 2011 NHS $1,390,815 <br />$0 <br />Description: Total: 1 800 000 Status: Const. scheduled to begin in 2011 Work type: Pavement Preservation <br />GRIND/INLAY AND OVERLAY PAVEMENT <br />Name: OR 140: WHITE CITY TO MP 8 PAVING Applicant: ODOT Key: 15009 <br />Hwy/St: LAKE OF THE WOODS <br />R te• OR-140 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 8.00 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />ROGUE VALLEY MP Other: <br />Description: Total: 600 000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation <br />CHIP SEAL <br />Name: OR234: ROGUE RIVER (DODGE) BRIDGE #01245B Applicant: ODOT Key: 14811 <br />Hwy/St: SAMS VALLEY <br />R te• OR-234 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />15.91 to 16.11 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO• <br />Non-MPO Other: <br />Description: Total: 490 000 Status: Const. scheduled to begin in 2010 Work type: Bridge <br />STRENGTHEN CRACKED BEAMS; REPAIR CRACKED CAPS; RAIL RETROFIT <br />2010-2013 DRAFT STIP WWH'•oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 122 <br />