JACKSON COUNTY <br />Name: OR66: NEIL CREEK BRIDGE #00380 Applicant: ODOT Key: 14810 <br />Hwy/St: GREEN SPRINGS <br />R OR-66 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. <br />Planning: <br />Milepoints: <br />4.16 to 4.36 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 1 901 000 Status: Const. scheduled to begin in 2010 Work type: Bridge <br />REPLACE BRIDGE #00380 <br />Name: OR273:SISKIYOU HWY OVER COR (STEINMAN) BR #03780 Applicant: ODOT Key: 14812 <br />Hwy/St: SISKIYOU <br />R OR-273 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. <br />Planning: <br />Milepoints: <br />3.53 to 3.73 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 229 000 Status: Const. scheduled to begin in 2010 Work type: Bridge <br />CLEAN & REPAIR CRACKED WALLS; REPAIR SPALLED GIRDERS <br />Name: OR273: SISKIYOU HWY OVER COR (DOLLARHIDE) #03781 Applicant: ODOT Key: 16040 <br />Hwy/St: SISKiYOU <br />R te• OR-273 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />4.69 to 4.71 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 --- <br />$75,000 2010 HBP $67,298 <br />$9,000 2011 HBP $8,076 <br />$0 <br />$743,000 2012 HBP $666,694 <br />$0 <br />Description: Total: 827 000 Status: Const. scheduled to begin in 2012 Work type: Brides <br />REPAIR & CLEAN CRACKED RR ABUTMENT WALLS; REMOVE EXCESS ACWS FROM DECK; BR 03781 <br />Name: EAST PINE ST: I-5 TO PENINGER RD Applicant: 7ACKSON COUNTY Key: 15254 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.P/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />ROGUE VALLEY MP Other: <br />$0 <br />$83,000 2009 <br />$83,000 2010 CMAQ $74,476 <br />$0 <br />$386,000 2010 CMAQ $346,358 <br />$0 <br />Description: Total: 552 000 Status: Const. scheduled to begin in 2010 Work type: Coneestion Memt <br />ADDING RIGHT TUR LANE WITH SIDEWALKS <br />Name: I5: N ASHLAND INTCHG--GREENSPRINGS -BUNDLE 314 Applicant: ODOT Key: 14641 <br />Hwy/St: PACIFIC <br />R I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. - <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />ROGUE VALLEY MP Other: <br />OTIA III ~ $20,823,000 <br />Description: Total: $30,696,000 Status: Const. scheduled to begin in 2010 Work type: Brides <br />REPLACE BR #08745, 08693 <br />2~1~-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 120 <br />