New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DOUGLAS COUNTY <br />Name: I-5: ELKHEAD RD INTCHGE-RICE HILL INTCHGE NB SEC <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />147.87 to 154 .88 Design: <br />ACT/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Applicant: oDOT Key: 15139 <br />2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />$4,758,552 <br />Description: Total: $5,460.000 Status: Const. scheduled to begin in 2013 <br />GRIND/INLAY OVERLAY PAVEMENT NORTHBOUND ONLY <br />Work type: Pavement Preservation <br />Name: I-5: SUTHERLIN HILL TRUCK CLIMBING LANE <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />138.00 to 140 .00 Design: <br />ACT/AREA: Land Purchase: <br />SWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Applicant: ODOT Key: 14992 <br />2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />HSIP ~ $760,815 <br />Description: Total: 850 000 Status: Const. scheduled to begin in 2011 <br />CONSTRUCT TRUCK CLIMBING LANE <br />Work type: Safe <br />Name: OR 38: CHARLOTTE CR - UMPQUA RIVER PAVING Applicant: ODOT Key: 16202 <br />Hwy/St: UMPQUA <br />~ OR 38 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />10.67 to 16.35 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 2 433 000 Status: Const. scheduled to begin in 2013 Work type: Pavement Preservation <br />GRIND/INLAY AND OVERLAY PAVEMENT <br />Name: OR 38: SCOTTS CR - ELKTON SLIDE PAVING Applicant: ODOT Key: 16203 <br />Hwy/St: UMPQUA <br />• OR 38 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />26.60 to 32.15 Design: <br />ACT/AREA: Land Purchase: <br />SWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 3 698 000 States: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />GRIND/INLAY AND OVERLAY PAVEMENT <br />Name: OR38: SCOTTSBURG-WELLS CR CURVE REALIGNMENT Applicant: ODOT Key: 16207 <br />Hwy/St: UMPQUA <br />R OR-38 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. <br />Planning: <br />Milepoints: <br />17.85 to 18.15 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$167,000 2010 HSIP $154,007 <br />$12,000 2011 HSIP $11,066 <br />$0 <br />$1,259,000 2013 HSIP $1,161,050 <br />$0 <br />Description: Total: $1,438.000 Status: Const. scheduled to begin in 2013 <br />INSTALL GUARDRAIL, CONSTRUCT SOLDIER PILE WALL, ADDRESS MINOR ROCK OUTCROPPING <br />Work type: Safe <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.