New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COOS COUNTY <br />Name: US101: MCCULLOUGH BRIDGE TO FIR AVE PAVING Applicant: ODOT Key: 15013 `..._ .~' <br />Hwy/St: OREGON COAST -- ~ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: , 1 <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />234.48 to 237.7 8 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$180,000 2008 <br />$594,000 2009 <br />$50,000 2010 NHS $44,865 <br />$2,570,000 2011 NHS $2,306,061 <br />$0 <br />._ <br />,,~ <br />J <br />,_~ <br />Description: Total: $3,394.000 Status: Const. scheduled to begin in 2011 Work type: Pavement Preservation - <br />GRIND/INLAY PAVEMENT <br />Name: US101: TUGMAN STATE PARK - SPINREEL RD. PAVING Applicant: ODOT Key: 16199 <br />Hwy/St: OREGON COAST , _. ~ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~ <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />221.26 to 224.40 Design: <br />ACT/AREA: Land Purchase: <br />SWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />~~ <br />Description: Total: $2,459,000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />GRIND/INLAY AND OVERLAY PAVEMENT <br />~..;~ <br />Name: US101: DAMS SLOUGH - 2ND STREET (BANDON) PAVING Applicant: ODOT Key: 16201 :~ j <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: " '~ <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />244.92 to 261.20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$585,000 2011 NHS $524,921 <br />$0 <br />$1,000 2012 NHS $897 <br />$7,350,000 2013 NHS $6,595,155 <br />$0 <br />_) <br />___, <br />~._ <br />+:. ) <br />/,._ .% <br />Description: Total: 7 936 000 Status: Const. scheduled to begin in 2013 Work type: Pavement Preservation <br />GRIND/INLAY AND OVERLAY PAVEMENT ~ ~` <br />~. 7 <br />Name: US101: NORTH BEND SB COUPLET SAFETY IMPROVEMENTS Applicant: ODOT Key: 16209 t~_: <br />Hwy/St: OREGON COAST ` -- <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~-- ~ <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />235.10 to 235.60 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$184,000 2010 HSIP $169,685 <br />$0 <br />$6,000 2011 HSIP $5,533 <br />$1,323,000 2012 HSIP $1,220,071 <br />$0 <br />~. ,' <br />,__, <br />~_ ~ <br />..~ <br />-. <br />Description: Total: 1 513 000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />ADJUST LANES AND ADD OVERHEAD SIGNING; RECONFIGURE SB SIGNAL AT VIRGINIA ~---1 <br />_._ ~ <br />~' _ ,, <br />Name: US101/OR240:COQUILLE R(BULLARDS)&SOUTH SL BR PAINT Applicant: ODOT Key: 15820 <br />Hwy/St: VARIOUS HIGHWAYS ~` --- <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />~~ ~ <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />~ ~ <br />(_, _. <br />--~ <br />~.~~ <br />Description: Total: $5.662.000 Status: Const. scheduled to begin in 2010 Work type: Bridee ~ <br />PAINT BRIDGES 07020 & 01940G ~. ~ <br />~, <br />i <br />2010-2013 DRAFT STIP W~'~'•oregon.gov/ODOT/HWY/STIP/ to download and/or search. Page 111 <br />~_~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.