VARIOUS COUNTIES <br />Name: REGION 2 PRESERVATION PROJECT RESERVE Applicant: ODOT Key: 15382 <br />,,.._ ~ <br />Hwy/St: VARIOUS HIGHWAYS ~ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />_J <br />Description: Total: $5.379,000 Status: Pooled Funding 2010 Work type: Pavement Preservation 1 <br />POOL FOR FUTURE PRESERVATION PROJECTS J\ <br />Name: REGION 2 ADVANCE ALLOCATION SAFETY - 2012 Applicant: ODOT Key: 16157 ~/ <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />,_~ <br />..~ <br />"~ <br />Description: Total: 1 500 000 Status: Pooled Funding 2012 Work type: Safe l <br />ADVANCE ALLOCATION FOR THE SAFETY PROGARM J <br />Name: REGION 2 INLAID DURABLE STRIPING PROJECT Applicant: ODOT Key: 16124 ,\"' ~ <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ,' ~ <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />Various <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />'. <br />(.~.. j <br />Description: Total: 921 000 Status: Const. scheduled to begin in 2013 Work type: Safe __, ~ <br />INSTALL INLAID WET WEATHER TAPE ON OR125 AND OR22 ~ ;~ <br />~_ ) <br />l_ .,. <br />Name: REGION 2 SAFETY PROJECTS RESERVE Applicant: ODOT Key: 15020 f °~, <br />Hwy/St: VARIOUS HIGHWAYS L- ~ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ;^-, <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Constmction: <br />MPO: <br />Non-MPO Other: <br />~ ) <br />l__> <br />\~ <br />t 1 <br />Description: Total: $1.795.000 Status: Pooled Funding 2010 Work type: Safe <br />SAFETY PROJECTS RESERVE `--- ~ <br />Name: REGION 2 SAFETY QUICK FDt - 2013 Applicant: ODOT Key: 16125 `. <br />`, . <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ,. _, <br />Route: -- <br /> Planning: <br />Milepoints. <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />.:' <br />(_ __~,, <br />(., _ ~~ <br />,._ <br />Description: Total: $1.500.000 Status: Const. scheduled to begin in 2013 Work type: Safe <br />REGION 2 "QUICK FIX" SAFETY IMPROVEMENTS ~ ~, <br />___, <br />_._~ <br />2OlO-2013 DRAFT STIP ~'~'WWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 108 <br />.......... <br />~ ,, <br />