New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VARIOUS COUNTIES <br />Name: REGION 2 DURABLE STRIPING PROJECTS 2010 Applicant: ODOT Key: 14772 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 851 000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />PLACE DURABLE STRIPING <br />Name: REGION 2 CULVERT REPLACEMENT Applicant: ODOT Key: 15450 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$190,000 2010 STP $170,487 <br />$15,000 2010 STP $13,460 <br />$0 <br />$1,050,000 2011 STP $942,165 <br />$0 <br />Description: Total: $1,255,000 Status: Const. scheduled to begin in 2011 Work type: Culvert <br />REGION 2 CULVERT REPLACEMENT <br />Name: REGION 2 MODERNIZATION PROJECT RESERVE Applicant: ODOT Key: 15017 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 4 558 000 Status: Pooled Funding 2010 Work type: Modernization <br />PROJECT RESERVE <br />Name: REGION 2 ADVANCE ALLOCATION MODERNIZATION - 2012 Applicant: ODOT Key: 16159 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 375 000 Status: Pooled Funding 2012 Work type: Modernization <br />ADVANCE ALLOCATION FOR THE MODERNIZATION PROGARM <br />Name: REGION 2 GUARDRAIL REPLACEMENT PROJECT - 2013 Applicant: ODOT Key: 16114 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$0 <br />$0 <br />$0 <br />$1,400,000 2013 STP $1,256,220 <br />$0 <br />Description: Total: $1.400,000 Status: Const. scheduled to begin in 2013 Work type: Operations <br />REPLACE GUARDRAIL IN REGION 2 <br />2OlO-ZO13 DRAFT STIP www•oregon.gov/ODOT/HWY/ST1P/ to download and/or search Page 104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.