YAMHILL COUNTY <br />Name: OR153: SALT CREEK (ASH SWALE) BRIDGE #05041 Applicant: ODOT Key: 14809 <br />Hwy/St: BELLEVUE-HOPEWELL <br />R te• OR-153 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />5.78 to 5.98 Design: <br />AC.P/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$298,000 2009 <br />$695,000 2010 STP $623,624 <br />$0 <br />$13,460,000 2011 STP $12,077,658 <br />$0 <br />Description: Total: $14.453.000 Status: Const. scheduled to begin in 2011 Work type: Brid e <br />REPLACE BRIDGE #05041 <br />Name: OR47: YAMHILL - CARLTON DEVELOPMENT Applicant: ODOT Key: 16129 <br />Hwy/St: TUALATIN VALLEY <br />Ro te• OR47 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />u . <br />Planning: <br />Milepoints: <br />34.47 to 38.00 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 311 000 Status: Final Plan sched. to begin in 2012 Work type: Pavement Preservation <br />INLAY/OVERLAY - PE ONLY <br />Footnote: PE ONLY. RW/UR/CN PHASES WILL BE IN A FUTURE STIP. <br />Name: OR99W: OR240 (NEWBERG) - OR18 (MCDOUGAL JCT) Applicant: ODOT Key: 16127 <br />Hwy/St: PACIFIC HWY WEST <br />R te• OR99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />23.76 to 29.79 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$460,000 2011 STP $412,758 <br />$384,000 2012 STP $344,563 <br />$83,000 2013 STP $74,476 <br />$7,007,000 2013 STP $6,287,381 <br />$0 <br />Description: Total: $7,934,000 Status: Const. scheduled to begin in 2013 Work type: Pavement Preservation <br />INLAY/OVERLAY <br />Name: OR154 @ STRINGTOWN ROAD Applicant: ODOT Key: 16119 <br />Hwy/St: LAFAYETTE <br />Ro te• OR154 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />u . <br />Planning: <br />Milepoints: <br />1.15 to 0.05 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 _,._._ <br />$268,000 2011 HSIP $247,150 <br />$283,000 2012 HSIP $260,983 <br />$30,000 2013 HSIP $27,666 <br />$1,002,000 2013 HSIP $924,044 <br />$0 <br />Description: Total: 1 583 000 Status: Const. scheduled to begin in 2013 Work type: Safe <br />T INTERSECTION AND BUILD LEFT TURN REFUGE <br />Name: OR18 @ CHRISTIANSON ROAD Applicant: ODOT Key: 16118 <br />Hwy/St: SALMON RIVER <br />R te• OR18 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />35.50 to 0.15 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$259,000 2010 HSIP $238,850 <br />$71,000 2011 HSIP $65,476 <br />$41,000 2012 HSIP $37,810 <br />$785,000 2012 HSIP $723,927 <br />$0 <br />Description: Total: 1 156 000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />BUILD LEFT TURN REFUGE/SEVER WEST CONNECTION OF CALEG PAYNE RD <br />2OlO-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 101 <br />