New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TILLAMOOK COUNTY <br />Name: US 101: ARCH CAPE TUNNEL - N. MANZANITA Applicant: ODOT Key: 16126 <br />Hwy/St: OREGON COAST <br />Route• US101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br /> Planning: <br />Milepoints: <br />35.91 to 43.75 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$360,000 2011 STP $323,028 <br />$18,000 2012 STP $16,151 <br />$0 <br />$3,293,000 2013 STP $2,954,809 <br />$0 <br />Description: Total: 3 671 000 Status: Const. scheduled to begin in 2013 Work type: Pavement Preservation <br />INLAY & REPAIR <br />Name: OR6 @ WILSON RIVER LOOP ROAD Applicant: ODOT Key: 12817 <br />Hwy/St: WILSON RIVER <br />Route• OR-6 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br /> Planning: <br />Milepoints: <br />1.00 to 3.00 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,285,000 2004 <br />$3,700,000 2008 <br />$120,000 2008 <br />$4,085,000 2010 TSP $1,511,450 NHS $2,309,246 <br />$0 <br />Description: Total: 9 190 000 Status: Const. scheduled to begin in 2010 Work type: Modernization <br />CONSTRUCT INTERCHANGE Work type 2: Safe <br />Name: US 101: THREE RIVERS (HEBO) BRIDGE #04660A Applicant: ODOT Key: 14808 <br />Hwy/St: OREGON COAST <br />R te• US-101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou <br />Planning: <br />Milepoints: <br />84.91 to 85.11 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$56,000 2009 <br />$6,000 2010 HBP $5,384 <br />$1,000 2010 HBP $897 <br />$615,000 2011 HBP $551,840 <br />$0 <br />Description: Total: 678 000 Status: Const. scheduled to begin in 2011 Work type: Bridee <br />REPAIR CRACKS IN BEAMS; SEISMIC RETROFIT; RAIL RETROFIT; PPC DECK OVERLAY BR 04660A. <br />Name: US101: MANZANITA AVE-NEAHKAHNIE CREEK Applicant: ODOT Key: 11258 <br />Hwy/St: OREGON COAST <br />Route• US-101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br /> Planning: <br />Milepoints: <br />43.01 to 43.33 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 3 600 000 Status: Const. scheduled to begin in 2011 Work type: Modernization <br />REALIGNMENT AND FISH PASSAGE IMPROVEMENT <br />Name: US101: NEAHKAHNIE CHASM & JETTY CR ROCK SCREENINGS Applicant: ODOT Key: 14786 <br />Hwy/St: OREGON COAST <br />Route• US-101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />o Planning: <br />Milep <br />ints: <br />40.71 to 47.68 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$150,000 2008 <br />$6,000 2009 <br />$0 <br />$1,084,000 2010 STP $972,673 <br />$0 <br />Description: Total: $1.240.000 Status: Const. scheduled to begin in 2010 Work type: Operations <br />INSTALL PROTECTIVE ROCK SCREENING <br />2010-2013 DRAFT STIP ~'~'~'•oregon.gov/ODOTBWY/STIP/ to download and/or search Page 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.