New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
POLK COUNTY <br />Name: OR22: GREENWOOD-DOAKS FERRY RD DEVELOPMENT Applicant: ODOT Key: 13591 <br />Hwy/St: WILLAMINA-SALEM <br />Route: OR-22 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Planning: $0 <br />Milepoints: <br />18.61 to 22.04 Design: $0 <br />ACT/AREA: Land Purchase: $300,000 2012 NHS $269,190 <br />MWACT Utility Reloc: $0 <br />Construction: $0 <br />MPO: <br />SALEM-KEIZER MPO Other: $0 <br />Description: Total: 300 000 Status: Land Purchase 2012 Work type: Modernization <br />LAND ACQUISITION FOR A FUTURE CONSTRUCTION PROJECT <br />Name: OR22: INDEPENDENCE HWY-WILLAMETTE RIVER Applicant: ODOT Key: 14818 <br />Hwy/St: WILLAMINA-SALEM <br />Route: OR-22 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Planning: $0 <br />Milepoints: <br />20.75 to 26.14 Design: $205,000 2008 <br />ACT/AREA: Land Purchase: $0 <br />MWACT Utility Reloc: $0 <br />Construction: $4,567,000 2010 NHS $4,097,969 <br />MPO. Other: $0 <br />SALEM-KEIZER MPO <br />Description: Total: 4 772 000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation <br />OVERLAY <br />Name: OR22: OR18-OR99W Applicant: ODOT Key: 14789 <br />Hwy/St: WILLAMINA-SALEM <br />R to OR 22 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />0.30 to 15.40 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 4 997 000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation <br />OVERLAY <br />Name: OR99W @ BETHEL ROAD Applicant: ODOT Key: 14756 <br />Hwy/St: PACIFIC HWY WEST <br />R te• OR-99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />49.39 to 49.40 Design: <br />AC.1./AREA: Land Purchase: <br />MWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 1 775 000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />RAISE ROADWAY GRADE, CUT BACK EMBANKMENT, ADD DELINEATION & LEFT-TURN REFUGE ON 99W <br />Name: OR221 (WALLACE RD) @ GLEN CR ROAD (SALEM) Applicant: ODOT Key: 14870 <br />Hwy/St: SALEM-DAYTON <br />Route: OR-221 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Planning: <br />Milepoints: <br />20.31 to 20,48 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br />Construction: <br />MPO: <br />SALEM-KEIZER MPO Other: <br />$0 <br />$500,000 2008 <br />$4,287,000 2010 OTHER $4,287,000 <br />$0 <br />$3,914,000 2011 STP $2,036,979 STP-U $1,053,610 OTHER $469,680 <br />$0 <br />Description: Total: 8 701 000 Status: Const. scheduled to begin in 2011 Work type: Modernization <br />RECONSTRUCT INTERSECTION; ADD SECOND LEFT-TURN LANE (NORTHBOUND TO WESTBOUND) <br />Footnote: MATCH PAID BY LOCALS <br />ZOlO-2013 DRAFT STIP WWW.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.