Traffic Engineer
<br />Project Manager
<br />$500,000
<br />Total Cost
<br />Transportation Safety & Enhancmt
<br />Project Category
<br />Transportation Planning & Oper.
<br />Budget Subprogram
<br />Traffic Control Projects Capital
<br />Project Tale Improvement
<br />Projects
<br />N/A Sheet
<br />Project Number
<br />Costs APPROPRIATIONS 2005 - 2006 2006 - 2007 2007 - 2008 2008 - 2009 2009 - 2010 5 Year Total
<br />Land and Right-of-Way Ongoing Program $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000
<br />Design and Engineering $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000
<br />Construction $ 80,000 $ 80,000 $ 80,000 $ 80,000 $ 80,000 $ 400,000
<br />Other $ - $ - $ - $ - $ - $ -
<br />TOTAL $ - $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
<br />
<br />Funding Source(s)
<br />CR-SDC Trans, Improvement $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
<br />TOTAL $ - $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
<br />Project Description:
<br />This project is for installation of new traffic signals and modification of existing signals or installation of roundabouts at various intersections in town. Potential
<br />candidate intersections include: Thurston Rd. & 66th St., S. 42nd St. & Daisy St., S 42nd St. & Jasper Road, 42nd & Marcola Road. The modification of
<br />signals may include change to permissive left turn at some existing signalized intersections.
<br />Justification:
<br />As traffic increases, additional traffic intersections will not operate in an acceptable manner with stop sign control. The intersections will meet roundabout or
<br />signal warrants. New signals or roundabouts will need: to be installed. The modification of existing signals is needed to maintain adequate traffic safety and to
<br />enhance traffic flow.
<br />Relation to Plans:
<br />This project is consistent with the Metro Area Transportation Plan for improving traffic flow, traffic safety, and reducing vehicular accidents.
<br />Maintenance Impacts:
<br />Traffic signals will increase costs for power, lamp replacement, and timing modifications. Roundabouts will increase costs for irrigation and landscape
<br />maintenance. Annual cost for roundabouts is about half the cost of traffic signals, with annual per signal cost being about $6,500 and annual roundabout
<br />maintenance cost being about $3,300.