Maintenance Manager <br />Project Manager <br />$4,120,710 <br />Total Cost <br />Preservation <br />Project Category <br />Surface Drainage Maintenance <br />Budget Subprogram <br />Millrace Water Control Structure Capital <br />Project Title Improvement <br />Projects <br />P10667 Sheet <br />Project Number <br /> PRIOR <br />Costs APPROPRIATIONS 2005 - 2006 2006 - 2007 2007 - 2008 2008 - 2009 2009 - 2010 5 Year Total <br />Land and Right-of-Way(Vinyard) $ 633,700 $ - $ - $ - $ _ $ _ $ _ <br />Design and Engineering $ 340,000 $ - $ - $ - $ _ $ _ $ _ <br />Construction $ 1,277,024 $ 3,740,270 $ 380,440 $ - $ - $ - $ 4,120,710 <br />Other $ - $ - $ - $ - $ - $ - $ - <br />TOTAL $ 2,250,724 $ 3,740,270 $ 380,440 $ - $ - $ - $ 4,120,710 <br /> <br />Funding Source(s). <br />Federal Grant $ 340,000 $ 3,740,270 $ - $ - $ - $ - $ 3,740,270 <br />Capital Bond $ 526,724 $ - $ - $ - $ - $ _ $ _ <br />CR-SDC Storm $ 400,000 $ - $ - $ - $ - $ _ $ _ <br />CR-SWUSR $ 350,300 $ - $ 280;440 $ - $ - $ - $ 280,440 <br />Existing City Assets $ 633,700 $ - $ 100,000 $ - $ - $ - $ 100,000 <br />TOTAL $ 2,250,724 $ 3,740,270 $ 380,440 $ - $ - $ - $ 4,120,710 <br />Project Description: <br />Design and construct a new inlet from the Middle Fork of the Willamette to the Mill Race and modify hydraulic <br />.characteristics of the Mill Race and Mill Pond in order to improve water quality and stabilize year round flows. <br />Obtain federal and state agency's approval as required. <br />Justification: <br />Restoration of the aquatic ecosystem of the Springfield Mill race from Clearwater Park to 7th Street (the Booth- <br />Kelly crane shed) bridge is the primary objective of this project. Additional project benefits include maintaining <br />the groundwater level in the Springfield Utility Board's S. 28th Street well field; prevention of flooding along the <br />Mill Race; and maintenance of adequate water supply for use by Springfield Forest Products. Due to potential <br />adverse impact on anadromous fish, federal and state regulatory agencies have limited our use of equipment in <br />the river to maintain Millrace flows; these agencies are requiring construction of permanent flow management <br />facilities. The estimated value of the existing City property and in-kind serves for a portion of City match in <br />this project. <br />Relation to Plans: <br />Addresses a Council top priority target of Millrace development, inlet to outlet. <br />_ .. ~ ~..: <br />--t 'i <br />,, <br />.. <br />,, - <br />.. <br />1 <br />~~ ~~ <br />` =~~ <br />u ce RR(~ r <br />~~- = " , c~,, ^ <br />MI}~L~t~~WATER ~'= ~~ . <br />-- CONTROL S1RUCfUR~~'•~ <br />Maintenance Impacts: <br />Maintenance costs are expected to increase by about $28,000 per year after the construction of the new facility. That cost increase is mostly related to maintaining <br />the additional planted area, public walkways, and other amenities which will be provided with the project. There have been discussions with Willamalane which will <br />continue, regarding their interest in taking on some of these obligations after project completion. <br />PageUl-8 <br />