LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br />Dillard Road, MP 0.00 to 4.02 <br />Highway 99 to Eugene UGB <br />Project #: 1870-1 <br />Road #: 1870-00 <br />MP: 0.00 to 4.016 <br />FC: Minor Collector <br />Category: GENERAL CONSTRUCTION <br />Scope: Shoulder widening <br />Justification: This road is popular with bicyclists that like to climb hills on rural routes. Currently there is little or no <br />accommodation for bicycles. <br /> FY 2007 <br /> Cost: 2,400,000 <br /> RIVV: 240,000 <br /> TOTAL: 2,640,000 <br />Franklin Boulevard East Road #: 1825-00 <br />I-5 Frontage to Twin Buttes Road MP: 0.00 to 1.121 <br />Project #: 1825-1 FC: Major Collector <br />Category: GENERAL CONSTRUCTION <br />Scope: Widen and Overlay <br />Justification: Identified through Lane County TSP needs analysis, Project #85. Targeted for improvements due to its <br /> substandard width and relatively high ADT of 4800. Projected increases in traffic warrant modernization of <br /> this section with the addition of adequate paved shoulders. <br /> FY: 2008 <br /> Cast: 2,300,000 <br /> RIW: 230,000 <br /> Tt~TAL: 2,530,000 <br />Game Farm Road North, MP 0.413 to 1.69 <br />Springfield city limits to Coburg Road. <br />Road #: 1710-00 <br />MP: 0.413 to 1.69 <br />Projecf #: 1710-1 FC: Urban Collector <br />Category: GENERAL CONSTRUCTION <br />Scope: Improve to urban standards. <br />Justification: TransPlan Project #654 -Identified from list of urban collector/arterials (roads within Urban Growth <br />Boundaries) without urban standards. Located in the north Eugene area with a large amount of developable <br />land, Game Farm Road North will experience an increase of traffic in the future. <br />FY: 2005 <br />Cost: 2,750,000 <br />RItrV: 275,000 <br />TOTAL: 3,025,000 <br />Green Hill Road, MP 1.869-5.072 <br />Royal Avenue to Clear Lake Road. <br />Road #: 4270-00 <br />MP: 2.818 to 5.072 <br />Project #: 4270-1 FC: Rural Major Collector (FAS) <br />Category: GENERAL CONSTRUCTION <br />Scope: Addition of shoulders, curb and gutter, or combination thereof. <br />Justification: This roadway borders along the edge of the urban growth boundary and also serves as a major route to Fern <br />Ridge Reservoir, the Eugene Airport, and the community of Alvadore. <br />FY 2007 <br />Cost: 2,000,000 <br />Rt~IV: 200,000 <br />TOTAL: 2,200,000 <br />30 <br />