New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-09 Lane County CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-09 Lane County CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:04:46 AM
Creation date
6/1/2009 12:21:21 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
Lane County CIP
Document_Date
5/1/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br />Bernhardt Heights Road Road #: 5052-00 <br />MP: 0.00 to 0.350 <br />Project #: 5052-1 FC: Rural Local <br />Category: GENERAL CONSTRUCTION <br />Scope: Realignment using existing BPA private roadway and establishing new roadway up to neighborhood. <br />Justification: Road stability problems persist along this narrow, steep gravel road. <br />I`Y 2005 <br />Cast: 350,000 <br />R/1N: 35, 000 <br />TOTAL: 385,000 <br />Bolton Hill Road Road ~: <br />Territorial Highway to Dogwood Lane MP: 0.00 to 0.653 <br />Project #: 4062-2 FC: Rural Major Collector <br />Cstegory: GENERAL CONSTRUCTION <br />Scope: Improve to urban standards. <br />Justification: Lane County TSP Project #15. City of Veneta TSP Project # B5. <br />FY 2009 <br />Cost: 1,300,000 <br />R; Vtf: 130,000 <br />TC7TAL: 1,430,000 <br />Brice Creek Road, MP 6.7 Road ~: 2470-00 <br />Slide Repair MP: 6.7 <br />Project ~: 2470-4 FC: Minor Collector <br />Category: SAFETY IMPROVEMENTS <br />Scope: Slide Repair <br />Justification: This project was one of six identified along this road by the US Forest Service as a candidate for Forest <br />Highway Enhancement funds. Four sites have been completed. MP 6.7 is the next priority. <br />FY 2006 <br />Cast: 200,000 <br />R(Vt~; 0 <br />TOTAL: 200,000 <br />NOTE: Will use the remaining $115,000 of Forest Highway funds. <br />Bridge Projects -Miscellaneous <br />Category: RIGHT-OF-WAY ACQUISITION <br />Scope: Funds to use for additional right-of-way for bridge projects as needed. <br />Justification: Until final designs are determined, exact right-of-way requirements are not known. This fund allows the <br />Right-of--Way Management Section to acquire right-of-way as needed. <br />PY 2005 <br />Cost: NA <br />RIUIt: 75,000 <br />TOTAL: 75,000 <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.