New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRY WEATHER HEADWORKS <br />Facility Process Component <br />Preliminary Treatment <br />$14,715,000 <br />Total Cost <br /> PRIOR <br />Costs EXPEND- 2005-06 2006.-07* .2007=08 2008-09 2009-10 TOTAL <br /> ITURES <br />Design & Engineering 2,200,000 2,200,000 <br />Construction 12,515,000 12,515,000 <br />TOTAL 0. 0 2 200 000 .12 515 000 0 14 715 000 <br />FUNDING SOURCE <br />Capital Reserve 2,000,000 11,095,000 13,095,000 <br />SDC Reimbursement Reserve 200,000 200,000 400,000 <br />SDC Improvement Reserve 1,220 000 1 220 000 <br />TOTAL 0 0 2,200,000 12,515,000 0 0 14,715,000 <br /> "Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Dry Weather Headworks <br />DESCRIPTION: Expand headworks so that all of the 2025 wet weather peak flow receives preliminary <br /> treatment. <br />JUSTIFICATION: New dry weather headworks that will be used in conjunction with the existing headworks <br /> (which will then be used for peak flow events) to provide preliminary treatment for a total <br /> peak wet weather flow of 277 mgd. <br />PROJECT DRNER: Increases in peak wet weatherflows resulting from the elimination of sanitary sewer <br /> overflows. <br />PROJECT TRIGGER: Peak wet weather flows in excess of 210 mgd. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $12,800,000 <br />(FY 2004-05 Dollars); <br />INFLATED PROJECT COST $14,715,000 <br />(FY 2007-OS Dollars): <br />PHASING: Budgeted for design in FY 2007/08 and construction in FY 2008/09 <br />Page 62 ~ FY OS-06 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.