New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WILLAKENZIE PUMP STATION EXPANSION <br />Facility Process Component <br />Collection System Pump Stations <br />$6,377,000 <br />Total Cost <br /> PRIOR <br />Costs EXPEND- 2005,06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Construction 6,377 000 6,377,000 <br />TOTAL 0 6,377 000 0 . 0 0 0 6 377 000 <br />FUNDING SOURCE <br />Capital Reserve 4,177,000 4,177,000 <br />SDC Reimbursement Reserve 1,200,000 1,200,000 <br />SDC Improvement Reserve 1 000 000 1 000 000 <br />TOTAL 0 6,377,000 0 0 0 0 6,377,000 <br /> * Inflated from 2004 by 6.3% to FY05-O6 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Willakenzie Pump Station Expansion <br />DESCRIPTION: Add four, 14-mgd pumps to increase capacity from 80 to 135 mgd. <br />JUSTIFICATION: Additional pumping, capacity is required to increase total influent pumping capacity to 277 <br /> mgd. <br />PROJECT DRIVER: Systematic elimination of sanitary sewer overFlows by the year 2010. <br />PROJECT TRIGGER: Collection system computer model estimates the current wet weather peak flow to plant to <br /> be 264 mgd. Overall existing peak flow capacity is 175-mgd so there is already a capacity <br /> deficit. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $6,000,000 <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $6,377,000 <br />(FY 2006-07 Dollars): <br />PHASING: Budgeted for FY 2005/06 <br />Page 60 FY OS-06 BUDGET AND CIP <br />