New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B10SOLIDS -LINE LAGOONS 1 <br />F_ acility Process Component <br />Biosolids <br />$1,858,000 <br />Total Cost <br /> PRIOR. <br />Costs EXPEND- 2005-06* 2006=07 .2007-08 2008-09 2009=10 TOTAL <br /> ITURES . <br />Construction 1,858 000 1,858,000 <br />TOTAL 0 1 858 000 0 0 0 0 1 858,000 <br />FUNDING SOURCE <br />Capital Reserve 1,508,000 1,508;000 <br />SDC Reimbursement Reserve 350,000 350 000 <br />TOTAL 0 1;858,000 0 0 0 0 .1,508;000 <br />PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />PROJECT DRIVER: <br />PROJECT TRIGGER: <br />TYPE OF PROJECT: <br />ESTIMATED PROJECT COST <br />(FY 2004-5 Dollars): <br />INFLATED PROJECT COST <br />(FY 2005-06 Dollars): <br />PHASING: <br />- Intlated trom "LUt)4 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />Biosolids -Line lagoons I <br />Reline lagoons, Phase 1 -from existing MWMC CIP. <br />Testing has indicated that the lagoons may be leaking. <br />Regulatory requirements and maintaining operational reliability. <br />Identification of temporary storage location for contents of lagoon and installation of <br />temporary equipment required to transfer lagoon contents. <br />100% Rehabilitation <br />$1,200,000 <br />$1,858,000 <br />Budgeted for FY 2005!06 <br />Page 54 FY OS-06 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.