New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2007 Pavement Management Report
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2007 Pavement Management Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 8:32:27 AM
Creation date
6/1/2009 12:20:58 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Road Repair
PW_Subject
Pavement Management
Document_Date
3/1/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O & M - Overview Maintenance Roles <br />Maintenance Division staff from both the surface technical and operations teams are involved <br />in a variety of roles associated with the Pavement Preservation Program (PPP). Pavement <br />rating, budget and street life analysis, project grouping, and preventative maintenance are all <br />components of a pavement management system that take place in the Maintenance Division. <br />Surface technical staff performs annual pavement rating of the City's transportation system in <br />order to track current pavement conditions. Streets are placed on the PPP list when the <br />Overall Condition Index (OCI) indicates an overlay treatment is needed. With this <br />information, detailed analysis is performed to help identify current treatment needs and <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.