1Vd®1`i'TIII.,3' ACTIVIT3~ ~P®RT <br />JLJI~II'; 2004 <br />CUI~ENT ~ISC.~I.. STD r <br />',Equipynent Repairs C~>rnpleted: (QTR (HOURS) <br />'Seasonal Waste Facility 18 31.8 <br />(,Regional Pump Stations 14 45.5 <br />Eugene Local P.S. 12 47.1 <br />Biosolids Facility 45 186.5 <br />Metro Plant 287 1,016.2 <br />Spfld. Pump Stations 13 39.7 <br />'T®'I'AI, 389 1,366.8 <br />Preventive 1Vlaintenance C®>inpleted; (QTR (HOURS) <br />Seasonal Waste Facility 44 47.2 <br />Regional Pump Stations 40 45.4 <br />Eugene Local P.S. 38 105.0 <br />Metro Plant 392 707.9 <br />Spfld. Pump Stations 22 62.1 <br />Biosolids Facility 57 93.0 <br />"I'~'I't~I~ 593 1,060.6 <br />(QTR (HOURS) <br />129 423.8 <br />253 1,131.8 <br />218 868.5 <br />717 3,265.2 <br />3,286 11,315.7 <br />160 796,8 <br />4,763 17,801.8 <br />(QTR (HOUR_~' •: <br />214 216.1 <br />387 703.0 <br />429 1,005.9 <br />.4,293 5,947.5 <br />304 629,5 <br />756 777.0 <br />12,173 17,497.4 <br />o~wunua rwmty -----•.-...---_ <br />9.6yy Facility Regional Pump <br />Spfld. Pump 7.4°x' Stations <br />Stations 6.?% <br />3.7°.6 <br />Eugene Local <br />P.S. <br />8.4°~ <br />Metro Plant~\ / <br />68.1% `'..,,.--../ <br />-,.... <br />Preventive Maintenance Completed <br />1~~~~1~°MI~\~~~A~~ <br />C <br />Spfld. Pump Seasonal Waste Regional Pump <br />Stations Faciifty <br />3.3% 4•~0 3~8g; Eugene Local <br />P.S. <br />3.1°6 <br />Biosolids Facility <br />11.8% <br />Metro Plant <br />73.896 <br />• Carredive Maintenance Completed <br />~~ ~A <br />~' +. <br />t . <br />