New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1999 Eugene Arterial & Collector Street Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
1999 Eugene Arterial & Collector Street Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2009 12:25:24 PM
Creation date
6/1/2009 12:19:27 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Road Repair
PW_Subject
Arterial & Collector Street Plan
Document_Date
11/1/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7) The following table (Figure 16) should be <br />used as a guideline for initial evaluation of <br />appropriate traffic calming strategies for various <br />types of streets. <br />i • • <br /> <br /> Major Minor <br />Traffic Calming Device i Arterial Arterial <br />Roundabouts <br />® <br />i <br />Traffic Circles No <br />Raised Crosswalks No No <br />Curb Extensions No <br />Parking Bays i <br />Chicanes i No <br />Street Closure i No No <br />Half Diverter i No No <br />Diagonal Diverter i No No <br />Star DiverCer No No <br />Raised Median i <br />Pavement SurFace Modification i <br />Speed Actuated Signing [ No No <br />Speed Humps i No No <br />Speed Tables No No <br />Landscaped Roadway i <br />Midblock Neckdown i No No <br />Angled Slow Point with Median i No No <br />Figure 16 <br />Major Neighborhood <br />Collector Collector <br />Yes <br />Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.