New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1999 Eugene Arterial & Collector Street Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
1999 Eugene Arterial & Collector Street Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2009 12:25:24 PM
Creation date
6/1/2009 12:19:27 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Road Repair
PW_Subject
Arterial & Collector Street Plan
Document_Date
11/1/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Citizen Involvement <br />A staff team consisting of staff from the Eugene Public <br />Works Department, Eugene Planning and Development <br />Department, Eugene Fire Department, Lane Transit <br />District, and Lane County Public Works Department <br />developed proposals for the Arterial and Collector <br />Street Plan with input from various citizen, neighbor- <br />hood, and special interest groups. <br />Earlier efforts to update the City's street classification <br />map in 1992-93 resulted in a certain degree of contro- <br />versy, primarily regarding traffic and livability issues on <br />residential collector streets in older neighborhoods. As a <br />result the City Council did not adopt a new classifica- <br />tion map, but directed staff to reevaluate the collector <br />street classification and related issues in conjunction <br />with the TransPlan update. <br />In January 1997 staff began the collector street <br />evaluation with the dual intentions of (1) preparing <br />a revised Street Classification Map, and (2) incorpo- <br />rating the map and classification structure into the <br />TransPlan update process. The map revision process <br />included an evaluation of the function and design <br />of collector streets; that evaluation has resulted in <br />several proposals that would respond to public <br />input by recommending the following changes to <br />collector street classification and design. <br />• Separating the former collector street classifi- <br />cation into two distinct-types of collectors: <br />a) Neighborhood Collector streets, which <br />carry low to moderate traffic volumes at low <br />speeds, serving mainly single-family residen- <br />tial areas by connecting the local street system <br />with other collector and arterial streets. <br />b) Major Collector streets, which carry higher <br />traffic volumes; serve commercial, industrial <br />and multifamily land uses; and also serve <br />single-family residential neighborhoods <br />where a combination of auto-volumes, <br />transit, and/or bicycle and pedestrian usage <br />suggest a higher classification of street. <br />• Providing a wider array of design options for <br />collector streets. In particular, the narrower and <br />more flexible design choices developed earlier <br />for the Local Street Plan have been adapted and <br />carried over in this document to apply to many <br />Neighborhood Collectors. <br />The first draft of this document (entitled Eu ene <br />Street Classifications and Design Standards was <br />released in August 1997. Notice of the process was <br />mailed to interested parties and presentations were <br />scheduled with neighborhood groups and other <br />affected parties. In September and October 1997, a <br />series of public information meetings on the draft <br />plan were held throughout the city. <br />The Planning Commission held a public hearing on <br />the August 1997 Draft Eugene Street Classifications <br />and Design Standards on November 4, 1997. The <br />Planning Commission received 26 pieces of testi- <br />mony on the draft plan, including comments and <br />letters received in advance of the hearing, oral and <br />written testimony submitted on the evening of the <br />hearing, and additional comments and letters <br />received following the hearing prior to the close of <br />the public record. Some of the letters included <br />petitions, so the commission actually heard from <br />more than 230 people. <br />After reviewing the testimony, the Planning Commis- <br />sion directed staff to address issues raised at the <br />public hearing. In February and March, 1998 staff <br />returned to the Planning Commission with a number <br />of recommendations for revising the plan to address <br />those issues. The Commission then directed staff to <br />prepare the revised Arterial and Collector Street Plan <br />for a second public hearing on the document. <br />The Planning Commission held its public hearing <br />on the second draft of the ACSP in June 1998. The <br />extensive testimony was reviewed in several work <br />sessions by the commission during fall of 1998, <br />which culminated in a third draft (April 1999). The <br />Commission forwarded the April 1999 draft to the <br />City Council with a recommendation to adopt. <br />The City Council met a total of four times to review, <br />discuss and/or receive testimony on the April 1999 <br />draft of the ACSP: <br />• At a Council work session on May 12 <br />• A public hearing held on June 14 <br />• A second work session on September 27, and <br />• A Council meeting to consider adoption of a <br />revised version of the ACSP, November 22 <br />The revisions in the final (November 1999) version <br />of the plan are extensive, resulting from public <br />testimony and City Council direction to staff during <br />the May-September 1999 period. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.