New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1999 Eugene Arterial & Collector Street Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
1999 Eugene Arterial & Collector Street Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2009 12:25:24 PM
Creation date
6/1/2009 12:19:27 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Road Repair
PW_Subject
Arterial & Collector Street Plan
Document_Date
11/1/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Projects involving construction, reconstruction or <br />improvement to arterial and collector streets are <br />proposed and adopted in TransPlan, as well as <br />various neighborhood refinement plans, including <br />the Central Area Transportation Study (CATS). More <br />discussion can be found in later sections of this <br />document on the relationship of this plan with other <br />adopted plans and policies. <br />Transportation Right-of-Way <br />Figure 1 <br />11 <br />Sidewalk Planting Parking Bike Travel Median or Travel Bike Parking Planting Sidewalk <br />Strip Lane Lane Lane .Leff Turn Lane Lane Lane Lane Strip <br />
The URL can be used to link to this page
Your browser does not support the video tag.