New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-01-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-01-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:31:58 AM
Creation date
6/1/2009 12:16:35 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Construction
Document_Date
3/6/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
also include: <br />7.2.1 Identification of all construction activities or phases which w171 be <br />covered by the permit. <br />7.2.2 A construction schedule for each of the construction activities or <br />phases identified <br />7.2.3 Identification of any period covered by the permit when no <br />construction activity will be occurring, and the person that wt71 be :responsible for <br />maintaining the . BMPs and providing for any. needed site stabl7ization during the <br />periods ofno construction <br />7.3 Individual Residential Permit -Template. If the proposed construction is for <br />one single family dwelling, or one duplex dwelling, the property owner need not utl7ize the <br />services of a certified professional in the preparation of the Plan. A template plan maybe <br />submitted, and upon approval by the City.. it wdl serve to satisfy requirements for the single <br />family dwelling and duplex construction activities. <br />7.4 Annual Permit. If the proposed construction activity qualifies for an annual <br />permit, preparation of a CSMP is not necessary In lieu of a CSMP, the applicant shall <br />submit all of the following information with the application: <br />7.4.1 Description ofthe scope ofwork and types of construction activities to <br />be performed <br />7.4.2 Identification ofthe sites where construction activities w171 occur during <br />the life of the permit, if known at the time the application is submitted <br />7.4.3 Description of the erosion, sedimentation, and construction site <br />management practices, including a description oferosion prevention materials located <br />at each site, to be employed during construction. activities .for meeting the <br />requirements of the Eugene Code, 1971 and these Rules and: specifically addressing <br />BMP's to be implemented during wet-weather season <br />7.4.4 Description ofthe training provided to applicant's crews or employees <br />on implementation of management practices to prevent sedimentation or erosion <br />7:5 AvAvailability The approved Construction Site Management Plan and Template <br />shall be kept at the construction site and be available during. on-site inspections. <br />8. ReviewCriteriaandAnproval. The CityshallreviewtheErpsionPreventionPetmit <br />application, including the Construction Site Management Plats, template, and: such other documents <br />Administrative Rule - 16 <br />L:11'<;MI'1U3N:rosionP~ewlao.wpd (i/13/U3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.