New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-01-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-01-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:31:58 AM
Creation date
6/1/2009 12:16:35 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Construction
Document_Date
3/6/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.645-F of these Rules; <br />2.2 For all other construction activities not subject to the erosion prevention <br />permit requirements, compliance by property owners with the standards. for preventing and <br />controlling erosion, sedimentation, and other impacts associated with construction site <br />management practices. The City w17i make information about these requirements ava>7able <br />.through a variety of techniques; including public outreach programs, handout materials, and <br />.other educational efforts to assist property owners in meeting this obligation. <br />3. Notwithstanding Subsection 1 above, the following activities.aze exempt from the <br />provisions of Sections 6.625 to 6.645 of the Eugene Code, 1971 and these rules: <br />3.1 Actions by a public utl`h'ty, the City, or any other governmental agency, to <br />remove or alleviate an emergency condition, restore ut~7ity .service, or reopen a public <br />thoroughfaze to traffic; or <br />3.2 Actions by any other person when the City determines, and documents m <br />writing, that such actions are necessary to remove or alleviate an emergency condition, <br />restore utility service, or reopen a public thoroughfare to traffic. - <br />3.3 The exemption in this subsection shall terminate at the time the emergency <br />condition is alleviated, utl~lity service is restored, or a thoroughfare is reopened to traffic. <br />3.4 The agency or public utility pertbrming the work shall take reasonable steps <br />to minimize sediment, dirt, debris, or other contaminants from entering the City stonmwater <br />system <br />R-6.645-D Outcomes: <br />1. All persons conducting construction activities covered byR=6.645-C.1 _ shall~employ, <br />to the maximum extent practicable, erosion prevention and construction site management practices <br />which w171 achieve during both the construction period and wet weather season the following <br />outcomes: <br />1.1 Adjacent properties, water features; and Related Natural Resource Areas aze <br />kept free ofdeposits or dischazges ofsol7, sediment or construction-relatedmaterial fromthe ` <br />site except those that would occur through natural processes from an undisturbed site; <br />1.2 Vegetation in water features, Related Natural Resource Areas; and associated <br />bank and/or riparian areas adjacent to construction sites aze preserved or protected from <br />impacts that exceed: those that occur through natural processes on an undisturbed site; <br />Administrative Rule - 9 <br />L:CI'l;MPY)3~rtisiooYcev-lao.wpd (i/13/U3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.